Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD96-02360
StatusFinaled
Name STATEWIDE CONSTRUCTION INC
Site Address 168 S VILLA PL
Project Name 
Customer Number 
ePlanReviewNo
Description
TO BUILD A NEW 2-STORY 2532 S.F SINGLE FAMILY DWELLING WITH 1548 S.F ON THE MAIN LEVEL AND 948 S.F ON THE UPPER LEVEL, AN 819 S.F ATTACHED GARAGE AND A 168 S.F. CONCRETE PATIO...ALL PER THE APPROVED PLANS AND ATTACHED CONDITIONS. ACHD # 96-0805 PR # 715 338 THIS LOT IS SOLER PROTECTED AND SHADE RESTRICTED REFER TO THE SETBACK CHANGES NOTED BY THE PLANNING AND ZONING DEPT ON THE PLOT PLAN.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (D)  4/18/1997 PASS
INSP - Final4/9/19974/9/19974/8/1997PPASS
Details
04/09/97 333 - FNL -OK FINAL
INSP - Letter of compliance4/8/19974/8/19974/8/1997 PASS
Details
/ / 333 - letter#12272
INSP - Letter of compliance4/8/19974/8/19974/8/1997 PASS
Details
/ / 333 - letter#12272
INSP - Energy code compliance1/16/19971/16/19971/16/1997APASS
DetailsWes Worcester
INSP - Framing/Rough-in1/16/19971/16/19971/16/1997APASS
DetailsWes Worcester
INSP - Framing/Rough-in1/15/19971/15/19971/15/1997PPASS
DetailsWes Worcester
INSP - Energy code compliance1/15/19971/15/19971/15/1997PPASS
DetailsWes Worcester
INSP - Framing/Rough-in1/14/19971/14/19971/14/1997PFAIL
DetailsWes Worcester
transfer pt lds, brace truss as per eng, blk tji's w/ld brng above
INSP - Framing/Rough-in1/9/19971/10/19971/10/1997ANR
DetailsWes Worcester
need plumbing inspection
INSP - Footings10/15/199610/15/199610/15/1996PPASS
DetailsWes Worcester
10/15/96 342 -
INSP - Foundation10/15/199610/15/199610/15/1996 PASS
DetailsWes Worcester
/ / 342 -
Issue PAID IN FULL permit  9/24/1996
Inspection Record Card- Bld  9/20/1996
PLANS/APPL TAKEN TO FRONT DESK  9/20/1996
Print Pending Permit.LaserJet4  9/20/1996 PASS
Routing - FRONT DESK9/18/1996 9/20/1996 PASS
Plan assigned to (338)9/19/1996 9/19/1996
Routing - PLANNING9/10/1996 9/18/1996 PASS
House must be moved 2' to the right to comply with Solar Setback. Contacted applicant on 9/17/96. Approved by MGH.
Print Pending Permit.LaserJet4  9/16/1996
Routing - PUBLIC WORKS9/5/1996 9/10/1996 PASS
Application received  9/5/1996