CHANGE STATUS TO (D) | | | 4/4/1997 | | PASS |
|
|
|
|
INSP - Letter of compliance | 3/28/1997 | 3/28/1997 | 3/28/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13793
|
INSP - Letter of compliance | 3/28/1997 | 3/28/1997 | 3/28/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13793
|
INSP - Final | 3/27/1997 | 3/28/1997 | 3/28/1997 | A | FAIL |
Jim Sly
|
|
|
C/N...
|
INSP - Final | 3/28/1997 | 3/28/1997 | 3/28/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13793
|
INSP - Final | 3/7/1997 | 3/10/1997 | 3/10/1997 | A | FAIL |
Jim Sly
|
|
|
03/07/97 316 - C/N...Headroom, int attic access, Plumb final,...
|
INSP - Framing/Rough-in | 2/10/1997 | 2/10/1997 | 2/10/1997 | | PASS |
Jim Sly
|
|
|
02/07/97 316 - FRAME REINSPECT OK
|
INSP - Energy code compliance | 2/7/1997 | 2/7/1997 | 2/7/1997 | P | PASS |
Jim Sly
|
|
|
02/07/97 316 -
|
INSP - Framing/Rough-in | 2/7/1997 | 2/7/1997 | 2/7/1997 | P | PART |
Jim Sly
|
|
|
02/07/97 316 - REINSPECT ON FRAME all OK except garage front shear..not insp on garage front.
|
INSP - Framing/Rough-in | 2/5/1997 | 2/6/1997 | 2/6/1997 | P | FAIL |
Jim Sly
|
|
|
02/06/97 316 - C/N...Misc fireblock..Provide engineering for front shear
|
INSP - Footings | 12/4/1996 | 12/5/1996 | 12/5/1996 | A | NR |
Jim Sly
|
|
|
12/04/96 316 - Poured W/O inspection...10:30 AM
|
Inspection Record Card- Bld | | | 11/13/1996 | | |
|
|
|
|
testing condition printout | | | 11/13/1996 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/1996 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/13/1996 | | PASS |
|
|
|
|
Plan assigned to (338) | 11/13/1996 | | 11/13/1996 | | PEND |
|
|
|
|
Telephone call | | | 11/13/1996 | | |
|
|
|
TOLD KAREN PERMIT READY
|
Issue PAID IN FULL permit | | | 11/13/1996 | | |
|
|
|
|
Plan assigned to (DJO) | 10/31/1996 | | 11/12/1996 | | PEND |
Dan Overy
|
|
|
TO 338
|
Routing - PLANNING | 11/8/1996 | | 11/7/1996 | | PASS |
|
|
|
Approved by GRH.
|
Routing - PLANNING | 11/1/1996 | | 11/4/1996 | | FAIL |
|
|
|
Does not comply with required solar setback. Called Classic @ 9:10 am 11/4/96 and they are going to nee site plan. Reviewed by GRH.
|
Routing - PUBLIC WORKS | 10/31/1996 | | 11/1/1996 | | PASS |
|
|
|
|
Application received | | | 10/31/1996 | | |
|
|
|
|
Routing - PLAN CHECK | 11/8/1996 | | | | PEND |
|
|
|
|
Routing - PLAN CHECK | 11/4/1996 | | | | PEND |
|
|
|
|