Permit Information
Permit NumberBLD97-00600
StatusFinaled
Name BINGHAM DENTAL
Site Address 3308 N MILWAUKEE ST
Project NameBINGHAM DENTAL
Customer Number 
ePlanReviewNo
Description
BINGHAM DENTAL * TO CONSTRUCT A NEW 2380 SQ.FT. SINGLE STORY, WOOD FRAMED, TYPE V-NONRATED, DENTAL OFFICE WITH A 272 SQ.FT. MECHANICAL BASEMENT. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC. PERMIT TO INCLUDE RELATED SITE DEVELOPMENT AND LANDSCAPING PER THE APPROVED PLANS. MJP (PC# 133-97) DR#12-97 CU#76-96 CU#141-89
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 10/15/199710/15/1997 DONE
Details
Permanent occupancy  10/15/1997 PASS
Perm. Occ. Cert. #7022 issued 10-15-97 to Bingham Dental.
Routing for occupancy9/25/19979/25/199710/8/1997 PASS
Insp. by Scott Brown/Req. $1,100.00 Bond. remaining landscaping - signed temporary Scott Brown inspected for final. Meets compliance DR-12-97.
INSP - Final10/7/199710/7/199710/7/1997PNH
DetailsJim Sly
10/07/97 316 - Occ Req card not on site...
INSP-Final Inspection10/6/199710/7/199710/7/1997APASS
DetailsJoe Tawney
10/07/97 406 - ###-#### CHRIS REINSP FOR FINAL OK FOR PERM OCC
Temporary occupancy  9/29/1997 PASS
Temp. Occ. Cert. #3480 issued 9-26-97 to Bingham Dental.
INSP - Final9/25/19979/25/19979/25/1997PPART
DetailsJim Sly
09/25/97 316 - Temp Occ.
INSP-Final Inspection9/24/19979/25/19979/25/1997PPART
DetailsRick Jackson
reinspection awaiting gas line labels for perm c/o
INSP - Final9/24/19979/25/19979/25/1997AFAIL
DetailsJim Sly
09/24/97 316 - C/N...Need fire and zone signatures, Misc corr....
INSP-Final Inspection9/23/19979/24/19979/24/1997AFAIL
DetailsRick Jackson
c/n issued: gas room door closure, labeling gas lines
INSP - Site Preparation9/4/19979/4/19979/5/1997PPASS
DetailsJim Sly
09/04/97 316 - CONCRETE VALLEY GUTTER IN THE PARKING LOT
INSP - Framing/Rough-in8/20/19978/21/19978/21/1997APASS
DetailsJim Sly
08/21/97 316 - All framing OK
INSP - Miscellaneous8/12/19978/13/19978/13/1997PPASS
DetailsJim Sly
08/12/97 316 - Fire wall inspection 1st layer...Medical gas room OK...
INSP - Carpentry8/7/19978/7/19978/7/1997PFAIL
DetailsTom Arcoraci
gas room needs floor protection
INSP - Carpentry8/1/19978/4/19978/4/1997APASS
DetailsTom Arcoraci
08/04/97 408 - LATE A.M.
INSP - Framing/Rough-in8/4/19978/4/19978/4/1997 PASS
DetailsTom Arcoraci
/ / 408 -
INSP - Carpentry7/31/19978/1/19978/1/1997AFAIL
DetailsJim Sly
07/31/97 316 - C/N....Fireblk, truss bracing, seal plate penitrations...
INSP - Carpentry7/29/19977/30/19977/30/1997PPART
DetailsJim Sly
07/30/97 316 -
INSP - Carpentry7/24/19977/25/19977/25/1997APASS
DetailsTom Arcoraci
07/25/97 408 -
INSP - Carpentry7/22/19977/22/19977/22/1997PPART
DetailsCarl Dependahl
STRUCT SHEATHING, PART: NEED HD'S INSTALLED PER PLAN, ARCH'S OK FOR TRUSSES OVERHANGING EXT WALLS. 316 AREA
INSP - Framing/Rough-in7/22/19977/22/19977/22/1997PNR
DetailsCarl Dependahl
TRAN TO 340 FOR SLY...nr for frame insp, met w/ Chris of Wright Bros. explained insp procedure
INSP - Foundation6/20/19976/23/19976/23/1997APASS
DetailsJim Sly
06/22/97 316 - FND.WALLS OK pending special inspection approval....
INSP - Footings6/18/19976/18/19976/18/1997PPASS
DetailsJim Sly
06/18/97 316 - OK pending special inspection OK.....
90 day tracking............. 3/18/19976/16/1997
(F) Reprint permit  6/10/1997
Issue PAID IN FULL permit  6/5/1997
Plan assigned to (M_P)4/8/1997 5/29/1997 PASS
DetailsMike Phillips
05/29/97 11:03:54 M_P - this action updated by action script from <<>> in Case No. BLD97-0600
Plan Reviewer's activity  5/29/1997 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/29/1997 PASS
Inspection Record Card- Bld  5/29/1997
Telephone call  5/29/1997 PASS
CHRIS WILL BE IN TO PICK THIS UP
Print Pending Permit.LaserJet4  5/29/1997 PASS
Print Occupancy Form  5/29/1997
Routing - MECHANICAL  5/29/1997 PASS
PACKAGE #1 PLANS WILL BE FIELD VERIFIED BY MECHANICAL INSPECTOR.
Routing Off Site - STRUCTURAL5/29/1997 5/28/1997 PASS
FOLLOW-UP STRUCTURAL REVIEW WAS DONE BY PLAN CHECKER
Plan Reviewer's activity  5/22/1997 FAIL
DISCUSSED ADDITIONAL CORRECTION ITEM WITH DAVE DAVIS OVER PHONE PER DAVE DAVIS' REQUEST. WAITING FOR CONFIRMATION OF NEEDED ITEM AS NOTED ON OFFICE COPY OF CORREECTION REPORT DATED APRIL 22 1997.
Plan resubmittals received  5/14/1997 PEND
REQUESTED FULL SIZE RESUBMITTED DRAWINGS.
Routing - FIRE4/23/1997 4/28/1997 PASS
PACKAGE #1
Print Pending Permit.LaserJet4  4/23/1997 FAIL
Plan Reviewer's activity  4/23/1997 FAIL
SENT COMPLETE CORRECTION REPORT TO ARCHITECT INCLUDED AN ADDITIONAL COPY OF THE STRUCTURAL COMMENTS FROM ATWOOD-HINZMAN-JONES.
Plan Reviewer's activity  4/15/1997
Sent submittal letter. Plans were drawn at 1/8" per 1' and the demension are not for that scale. Building looks like it was drawn at 1/4" per 1'. REMOVED OFF THE HOLD LIST, DISCUSSED THE PLANS WITH THE ARCHTECT AND IS SENDING LETTER TO REFERENCE THE SCALE SIZE IS TO BE 1/4" PER 1'.
Routing - PUBLIC WORKS4/10/1997 4/15/1997 PASS
PACKAGE #2
Plan assigned to (RGG)3/19/1997 4/8/1997
Routing - PLANNING3/28/1997 3/31/1997 PASS
PACKAGE #2 X-ref: CU-76-96,CU-141-89, DR-12-97. Approved by JH & MS.
Routing - ELECTRICAL3/25/1997 3/31/1997 PASS
PACKAGE #1
Routing Off Site - STRUCTURAL3/19/1997 3/28/1997 FAIL
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, AND JONES
Routing - PLUMBING3/19/1997 3/25/1997 PASS
PACKAGE #1
Routing - PUBLIC WORKS3/19/1997 3/24/1997 FAIL
PACKAGE #2 Requires drainage plan revision per Brian Murphy.
Plan routing begun/NEW & ADDTN  3/19/1997 PASS
Plan assigned to (MYS)3/18/1997 3/19/1997 PEND
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  3/19/1997 PASS
Received Certificate of Value  3/19/1997 PASS
Application received  3/18/1997
Recd Pcfee & Taken To Pln CK  3/18/1997
Routing Off Site - A.C.H.D3/19/1997 5/28/1907 PASS
PACKAGE #4 CONTACTED DAVID DAVIES AT ###-#### TO TAKE PLANS OUT TO ACHD. RECEIVED COPY OF ACHD FEEE RECEIPT AND SIGNED PLANS. PACKAGE #1 IS SIGNED BY ACHD, PACKAGE #4 DISAPEARED IN TRANSIT.