Permanent occupancy | | | 5/11/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7245 issued 5-11-98 to Power Engineers.
|
Permanent Occupancy | | 5/8/1998 | 5/8/1998 | | DONE |
|
|
|
|
INSP - Final | 3/6/1998 | 3/6/1998 | 3/6/1998 | P | PASS |
|
|
|
03/06/98 338 - signed the occ req card permPLEASE CALL MIKE AT ###-####
|
INSP - Final | 3/5/1998 | 3/5/1998 | 3/6/1998 | P | PASS |
|
|
|
03/06/98 338 - passed signed the perm col of the occ req cardScheduled b
|
INSP-Final Inspection | 2/19/1998 | 2/19/1998 | 2/19/1998 | P | PASS |
Joe Tawney
|
|
|
02/19/98 406 - ###-#### mike FINAL OK FOR CERT OF COMPLETION ì
|
INSP - Framing/Rough-in | 2/5/1998 | 2/5/1998 | 2/5/1998 | P | PASS |
|
|
|
02/05/98 338 - ###-#### mike made ok with other agencies approval
|
Print Occupancy Form | | | 2/4/1998 | | |
|
|
|
|
Plan assigned to (DRS) | 1/30/1998 | | 2/4/1998 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 2/3/1998 | | 2/4/1998 | | PASS |
|
|
|
Issuing as Desk permit. Reviewed with Floyd Varley to verify UFC requirements could be verified.
|
Inspection Record Card- Bld | | | 2/4/1998 | | |
|
|
|
|
(F) Reprint permit | | | 2/4/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/1998 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 2/4/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/4/1998 | | PASS |
|
|
|
Issuing as desk permit - Fire Department/UFC requirements will be reviewed in field - verified with Floyd Varley.
|
Application received | | | 1/30/1998 | | |
|
|
|
|