Permit Information
Permit NumberBLD98-00527
StatusFinaled
Name SCOTT WENDELL
Site Address 3040 N FIVE MILE RD
Project NameMEDALLION BLDG. #1
Customer Number 
ePlanReviewNo
Description
MEDALLION FIVE MILE PROFESIONAL PARK - BUILDING #1 (SHELL PERMIT ONLY) TO CONSTRUCT A NEW 6120 SQ. FT., ONE STORY WOOD FRAMED OFFICE SHELL BUILDING WITH A 590 SQ. FT. ATTIC MECHANICAL PLATFORM. THE CONCRETE SLAB FLOORS WILL BE INSTALLED DURING THE TENANT IMPROVEMENT PHASE OF THIS BUILDING PROJECT. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS PERMIT IS FOR THE CONSTRUCTION OF A SHELL BUILDING ONLY. NO OCCUPANCY WILL BE ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED FOR EACH PROPOSED TENANT. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH97-133/PC#121-98/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  11/3/1998 PASS
Letter of Compliance #14932 issued 11-3-98.
INSP - Final11/2/199811/2/199811/2/1998 PASS
DetailsTom Arcoraci
/ / 408 -
INSP-Final Inspection10/29/199810/30/199810/30/1998APASS
Details
don digital pager-###-#### fn insp
INSP - Final10/29/199810/29/199810/30/1998PNR
DetailsTom Arcoraci
10/29/98 408 - don digital pager ###-#### fn occ
Code Occupancy Approval  10/30/1998 PASS
Meets compliance with DRH97-0133/DRH97-0178 - Pass.
INSP-Final Inspection10/21/199810/21/199810/22/1998PFAIL
DetailsJoe Tawney
10/22/98 406 - MEDALLION BLDG #1--DON PAGER ###-#### FINAL SHELL FAIL BLDG ADDRESS
Print Occupancy Form  10/21/1998
INSP - Framing/Rough-in9/3/19989/3/19989/3/1998 PASS
DetailsTom Arcoraci
/ / 408 -
INSP - Framing/Rough-in8/28/19988/31/19988/31/1998AFAIL
DetailsTom Arcoraci
08/31/98 408 - digital pager ###-####
INSP - Conference8/21/19988/21/19988/21/1998 PASS
DetailsAlan Hauser
/ / 350 - posted notice for hvac contractor to get permit
INSP - Foundation7/6/19987/7/19987/7/1998APART
DetailsTom Arcoraci
07/07/98 408 - stem wall/ don-pager ###-#### bldg. #1
INSP - Foundation7/6/19987/6/19987/6/1998PPART
DetailsJim Sly
/ / 316 - Stem Wall ( N. W. and part of South wall) OK pending special Verified Ufer Ground in Bldg #2...coppr
INSP - Foundation6/30/19986/30/19987/1/1998PPASS
DetailsTom Arcoraci
06/30/98 408 - footing/don ###-#### RE BAR INPLACE
(F) Reprint permit  6/11/1998
(F) Reprint permit  6/11/1998
(F) Reprint permit  6/11/1998
Issue PAID IN FULL permit  6/10/1998
Routing - PLAN CHECK6/4/1998 6/8/1998 PASS
Inspection Record Card- Bld  6/8/1998
PLANS/APPL TAKEN TO FRONT DESK  6/8/1998 PASS
Telephone call  6/8/1998
CALLED JACK AT ###-#### PERMIT READY
Plan assigned to (JCM)3/5/1998 6/8/1998 PASS
DetailsJohn Menard
Routing Off Site - A.C.H.D3/5/1998 6/5/1998 PASS
CONTACTED SCOTT WENDELAT ###-#### TO TAKE PLANS OUT TO ACHD. CERTIFICATE #98-1720
Routing - PUBLIC WORKS6/2/1998 6/4/1998 PASS
Routing - PLAN CHECK5/6/1998 6/2/1998 PEND
90 day tracking............. 3/3/19986/1/1998 PEND
Routing - PLANNING5/5/1998 5/6/1998 PASS
NEIGHBORS SIGNATURES (ALONG THE EAST SIDE) ARE IN FILE DRH97-0178 FOR TRASH RECEPTACLE LOCATION AND MECHANICAL UNITS ON EAST SIDE. TKW
Plan resubmittals received  4/17/1998 PEND
RECEIVED RESUBS FROM SCOTT WENDALL, PASSED THEM ON TO JOHN MENARD. DAR
Plan resubmittals received  4/8/1998 PEND
RECEIVED RESUBMITTALS AND SENT TO JOHN M.
Routing - FIRE4/1/1998 4/7/1998 PASS
PACKAGE #1
Plan resubmittals requested  4/1/1998 PEND
CORRECTION LIST SENT TO THE ARCHITECT FOR REQUIRED RESUBMITTALS.
Routing - PLAN CHECK3/30/1998 4/1/1998 PEND
Routing - PLUMBING3/30/1998 3/30/1998 PASS
PACKAGE #1
Routing - PLANNING3/18/1998 3/27/1998 FAIL
PACKAGE #1 Contacted Scott Wendell last week and let him know that there are still items that need to be resolved on the DR before I can sign off building plans. Since this may take awhile, plans are being returned to building to route elsewhere.
Routing - PUBLIC WORKS3/5/1998 3/18/1998 FAIL
PACKAGE #1 THIS PROJECT IS FOR BUILDINGS #1 & 2. BRIAN STATED THAT BUILDINGS #3 & 4 WHEN SUBMITTED WILL REQUIRE DRAINAGE AND GRADING PLANS. KMM INCOMPLETE LEGAL DESCRIPTION AND REQUIRES PROOF OF LEGAL LAND DIVISION. PER JAMES RICH.
Routing Off Site - STRUCTURAL3/5/1998 3/6/1998 PASS
WILL GIVE PLANS TO ARLAN S. TO EVALUATE FOR OUTSIDE ENG. 3-6-98 ARLAN STATED WE WILL DO ENGINEERING IN HOUSE.
Received Certificate of Value  3/5/1998 PASS
Plan routing begun/NEW & ADDTN  3/5/1998 PASS
Routing - PLAN CHECK3/3/1998 3/5/1998 PASS
Plan assigned to (MYS)3/3/1998 3/5/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  3/5/1998 PASS
RECEIVED ONE PROJECT MANUAL FOR BUILDINGS 1 AND 2. I WILL PUT IT WITH BUILDING #1
Recd Pcfee & Taken To Pln CK  3/3/1998 PEND
Application received  3/3/1998