BLD-Wall cover | 9/21/1999 | 10/9/1999 | 10/9/1999 | A | PART |
|
|
|
ok on the 4-hour walls
|
BLD-Wall cover | 9/30/1999 | 10/8/1999 | 10/8/1999 | A | PART |
|
|
|
4hr wall and attachments resubmittal on handicapped
|
BLD-Wall cover | 9/30/1999 | 10/6/1999 | 10/6/1999 | P | PART |
|
|
|
4-hr wall need submittal for 3 and 4 wall assys installing mech aelec and plmg
|
BLD-Wall cover | 9/30/1999 | 10/4/1999 | 10/4/1999 | A | PART |
|
|
|
4-hr wall framing and cover discussion of 4 hr wall at top plate at sliding assy
|
BLD-Wall cover | 9/21/1999 | 9/29/1999 | 9/28/1999 | A | PART |
|
|
|
Review with super penetrations/obstructions of time 4-hour wall
|
BLD-Wall cover | 9/21/1999 | 9/27/1999 | 9/27/1999 | A | PART |
|
|
|
Conf on 4hr walls & resubmittal to be issued
|
BLD-Wall cover | 9/21/1999 | 9/24/1999 | 9/24/1999 | A | PART |
|
|
|
Review of wall finish 4-hr walls
|
BLD-Wall cover | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PART |
|
|
|
dampers/ 4" to 8" = received sp. Insp. Reports for concrete
|
BLD-Wall cover | 9/21/1999 | 9/21/1999 | 9/21/1999 | | PART |
|
|
|
|
Plan resubmittals received | | | 8/13/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS, FORWARDED SAME TO PERRY PAINE. 8/13/99 DAR
|
INSP - Concrete | 8/6/1999 | 8/6/1999 | 8/6/1999 | A | PART |
|
|
|
for r-bare p[lacement and concrete pour 2" slump at 80 degrees arrival to jobsite, plastisizer added to make 7" slump air at the schute is 7.5 and at the slab is 3.5 to 4 and 80 degrees.
|
INSP - Foundation | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
|
|
|
re bar insp and conf with ele cont and proset mfg on the applications of the sleeve for multiple ele wires in same. need more info from w/h or ul for the proposed change in install.
|
INSP - Foundation | 7/30/1999 | 8/2/1999 | 8/2/1999 | P | PART |
|
|
|
pt deck (rick fine engineer showing up Wed.) lloyd ###-#### (darrell will be back on mon) conf with darrell
|
INSP - Foundation | 7/26/1999 | 7/26/1999 | 7/26/1999 | P | PART |
|
|
|
07/26/99 338 - MADE OK TO POUR COLUMS
|
INSP - Foundation | 5/21/1999 | 5/21/1999 | 5/21/1999 | P | PART |
|
|
|
05/21/99 338 - made ok for the east most cornes
|
INSP-Supply line flush | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | PASS |
Rick Jackson
|
|
|
underground flush okay
|
Plan Modification Accepted | | | 5/19/1999 | | PASS |
|
|
|
modification of existing post tension slab approved by out side engineering firm and stamped and signed by plan reviewer dated 5/19/99. mjp
|
Plan resubmittals received | | | 5/19/1999 | | |
|
|
|
Received copies of plans which have been approved by out side engineering firm for post tension slab.
|
Plan Modification Accepted | | | 5/18/1999 | | PASS |
|
|
|
RECEIVED TWO COPIES OF REVISED STRUCT. DRAWINGS. ROUTED TO MIKE P. KMM
|
INSP - Foundation | 5/17/1999 | 5/17/1999 | 5/17/1999 | P | PART |
|
|
|
###-#### DARRYL//FOUNDATION WALL GRIDLINE 1 & GRIDLINE A made ok to pour the remaining of the tall ext walls also ok to start forming of the interior footing in wait for the approved plans to arrive on site approved by mjp per conv with same.
|
Routing Off Site - STRUCTURAL | 5/14/1999 | | 5/17/1999 | | PASS |
|
|
|
Faxed resubmittal comments to outside engineering firm. Received comments from outsid engineering firm. No further review required for change to post tension slab.
|
Plan resubmittals received | | | 5/14/1999 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/6/1999 | | 5/12/1999 | | |
|
|
|
SENT RESUBS TO OUTSIDE STRUCTURAL ENGINEER. 5/6/99 DAR
|
INSP - Foundation | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | PART |
|
|
|
05/07/99 338 - madeok to pour with sp insp approvals
|
Plan Reviewer's activity | | | 4/30/1999 | | FAIL |
|
|
|
Additional corrections required to be reviewed by outside structural engineering firm.
|
(F) Reprint permit | | | 4/26/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/22/1999 | | |
|
|
|
|
Telephone call | | | 3/11/1999 | | PASS |
|
|
|
talked to mark sanders to verify plans are ready
|
Plan assigned to (M_P) | 12/2/1998 | | 3/9/1999 | | PASS |
Mike Phillips
|
|
|
03/09/99 10:17:13 M_P - this action updated by action script from <<>> in Case No. BLD98-3726
|
Inspection Record Card- Bld | | | 3/9/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/9/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/9/1999 | | PASS |
|
|
|
DEFEREDSUBMITTAL REQUIRED FOR POST TENSION SLAB.
|
Print Occupancy Form | | | 3/9/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/4/1999 | | 3/3/1999 | | |
|
|
|
CONTACTED PDQ. TO TAKE RESUBMITTED PLANS TO OUTSIDE ENG. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/1999 | | PEND |
|
|
|
RECEIVED CACULATIONS FROM ATWOOD HINZMAN JONES, FORWARDED SAME TO MIKE PHILLIPS. DAR 2/11/99
|
Routing - PUBLIC WORKS | 2/4/1999 | | 2/5/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/4/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED STRUCTURAL SHEETS S1.1, S2.1, S2.2, S2.3, S3.1, S3.2, S3.3, S4.1. ROUTED ONE COPY TO OUTSIDE ENG. AND TWO COPIES TO MIKE P. ALSO RECEIVED COMMENT RESPPONSES WITH ADDITIONAL CALCS. KMM
|
Routing - PLAN CHECK | 2/2/1999 | | 2/4/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/29/1998 | | 2/2/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 2/2/1999 | | 2/2/1999 | | PASS |
|
|
|
Site plan and parking plan approved as per revised plans submitted December 16, 1998. Revised plans included in cup98-0098 file. TAC Revised plans for the Design Review have been submitted (DRH98-0131).
|
Plan resubmittals received | | | 1/27/1999 | | |
|
|
|
Received particial waiting for structural comments to be submnitted.
|
Routing Off Site - STRUCTURAL | 12/2/1998 | | 12/31/1998 | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO ENG.
|
Routing - FIRE | 12/23/1998 | | 12/29/1998 | | PASS |
|
|
|
not reviewed by UBC yet
|
Routing - PLUMBING | 12/16/1998 | | 12/22/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/2/1998 | | 12/10/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN APPROVAL PER BRIAN MURPHY
|
Plan routing begun/NEW & ADDTN | 12/2/1998 | | 12/2/1998 | | |
|
|
|
|
Plan assigned to (MYS) | 12/1/1998 | | 12/2/1998 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 12/2/1998 | | PASS |
|
|
|
11-30-98 REQUIRED SEPARATING FOUND. GRADING AND CLUBHOUSE. VALUES.
|
Plans ACCEPTED BY PLAN TECH | | | 12/2/1998 | | PASS |
|
|
|
11-30-98 REQUIRED CALLING OUT WITH SEPARATE PERMITS - FOUNDATION, GRADING AND DRAINAGE, AND CLUBHOUSE. KMM 12-01-98 REQUIRES ONE MORE COPY OF STRUCT. CALCS. KMM
|
Recd Pcfee & Taken To Pln CK | | | 12/1/1998 | | |
|
|
|
|
Application received | | | 11/30/1998 | | PASS |
|
|
|
|