Permit Information
Permit NumberBLD98-03726
StatusExpired
Name URBAN RENEWAL AGENCY OF BOISE
Site Address 1249 GRAND AVE
Project NameRIVER PLAZA APT
Customer Number 
ePlanReviewNo
Description
RIVER PLAZA APARTMENTS FOUNDATION AND CLUB HOUSE SHELL ONLY * A FOUR-HOUR AREA SEPARATION WALL IS BEING CONSTRUCTED TO DIVIDE THIS BUILDING INTO TWO BUILDINGS. TO CONSTRUCT A NEW CONCRETE FOUNDATION AND CLUB HOUSE STRUCTURAL SLAB AS A THREE-HOUR OCCUPANCY SEPARATION PER UBC SECTION 311.2.2.1. THE CLUB HOUSE AREA IS APPROXIMATELY 4000 SQ.FT. THIS UNFINISHED AREA WILL INCLUDE THE LAUNDRY FACILITIES FOR THE APARTMENT COMPLEX. THIS PORTION OF THE BUILDING WILL BE FIRE SPRINKLERED THROUGHOUT TO ALLOW THIS OCCUPANCY TO BE LOCATED BELOW THE THREE-HOUR OCCUPANCY SEPARATION. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. THERE WILL NOT BE A CERTIFICATE OF OCCUPANCY ISSUED FOR THIS PORTION OF THE BUILDING. SEPARATE PERMITS AND AND CERTIFICATE OF OCCUPANCY WILL BE REQUIRED FOR THE COMPLETION OF THIS PORTION OF THE BUILDING. MJP DR98-0131 PC#817-98 REFER TO BLD98-3749 FOR ADDITIONAL COMMENTS. Post tension slab modified per structural plans approved on 5/19/99. mjp
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover9/21/199910/9/199910/9/1999APART
Details
ok on the 4-hour walls
BLD-Wall cover9/30/199910/8/199910/8/1999APART
Details
4hr wall and attachments resubmittal on handicapped
BLD-Wall cover9/30/199910/6/199910/6/1999PPART
Details
4-hr wall need submittal for 3 and 4 wall assys installing mech aelec and plmg
BLD-Wall cover9/30/199910/4/199910/4/1999APART
Details
4-hr wall framing and cover discussion of 4 hr wall at top plate at sliding assy
BLD-Wall cover9/21/19999/29/19999/28/1999APART
Details
Review with super penetrations/obstructions of time 4-hour wall
BLD-Wall cover9/21/19999/27/19999/27/1999APART
Details
Conf on 4hr walls & resubmittal to be issued
BLD-Wall cover9/21/19999/24/19999/24/1999APART
Details
Review of wall finish 4-hr walls
BLD-Wall cover9/21/19999/22/19999/22/1999APART
Details
dampers/ 4" to 8" = received sp. Insp. Reports for concrete
BLD-Wall cover9/21/19999/21/19999/21/1999 PART
Details
Plan resubmittals received  8/13/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS, FORWARDED SAME TO PERRY PAINE. 8/13/99 DAR
INSP - Concrete8/6/19998/6/19998/6/1999APART
Details
for r-bare p[lacement and concrete pour 2" slump at 80 degrees arrival to jobsite, plastisizer added to make 7" slump air at the schute is 7.5 and at the slab is 3.5 to 4 and 80 degrees.
INSP - Foundation8/5/19998/5/19998/5/1999PPART
Details
re bar insp and conf with ele cont and proset mfg on the applications of the sleeve for multiple ele wires in same. need more info from w/h or ul for the proposed change in install.
INSP - Foundation7/30/19998/2/19998/2/1999PPART
Details
pt deck (rick fine engineer showing up Wed.) lloyd ###-#### (darrell will be back on mon) conf with darrell
INSP - Foundation7/26/19997/26/19997/26/1999PPART
Details
07/26/99 338 - MADE OK TO POUR COLUMS
INSP - Foundation5/21/19995/21/19995/21/1999PPART
Details
05/21/99 338 - made ok for the east most cornes
INSP-Supply line flush5/19/19995/19/19995/19/1999PPASS
DetailsRick Jackson
underground flush okay
Plan Modification Accepted  5/19/1999 PASS
modification of existing post tension slab approved by out side engineering firm and stamped and signed by plan reviewer dated 5/19/99. mjp
Plan resubmittals received  5/19/1999
Received copies of plans which have been approved by out side engineering firm for post tension slab.
Plan Modification Accepted  5/18/1999 PASS
RECEIVED TWO COPIES OF REVISED STRUCT. DRAWINGS. ROUTED TO MIKE P. KMM
INSP - Foundation5/17/19995/17/19995/17/1999PPART
Details
###-#### DARRYL//FOUNDATION WALL GRIDLINE 1 & GRIDLINE A made ok to pour the remaining of the tall ext walls also ok to start forming of the interior footing in wait for the approved plans to arrive on site approved by mjp per conv with same.
Routing Off Site - STRUCTURAL5/14/1999 5/17/1999 PASS
Faxed resubmittal comments to outside engineering firm. Received comments from outsid engineering firm. No further review required for change to post tension slab.
Plan resubmittals received  5/14/1999
Routing Off Site - STRUCTURAL5/6/1999 5/12/1999
SENT RESUBS TO OUTSIDE STRUCTURAL ENGINEER. 5/6/99 DAR
INSP - Foundation5/7/19995/7/19995/7/1999PPART
Details
05/07/99 338 - madeok to pour with sp insp approvals
Plan Reviewer's activity  4/30/1999 FAIL
Additional corrections required to be reviewed by outside structural engineering firm.
(F) Reprint permit  4/26/1999
Issue PAID IN FULL permit  4/22/1999
Telephone call  3/11/1999 PASS
talked to mark sanders to verify plans are ready
Plan assigned to (M_P)12/2/1998 3/9/1999 PASS
DetailsMike Phillips
03/09/99 10:17:13 M_P - this action updated by action script from <<>> in Case No. BLD98-3726
Inspection Record Card- Bld  3/9/1999
Print Pending Permit.LaserJet4  3/9/1999 PASS
Plan Reviewer's activity  3/9/1999 PASS
DEFEREDSUBMITTAL REQUIRED FOR POST TENSION SLAB.
Print Occupancy Form  3/9/1999
PLANS/APPL TAKEN TO FRONT DESK  3/9/1999 PASS
Routing Off Site - STRUCTURAL2/4/1999 3/3/1999
CONTACTED PDQ. TO TAKE RESUBMITTED PLANS TO OUTSIDE ENG. KMM
Plans ACCEPTED BY PLAN TECH  2/11/1999 PEND
RECEIVED CACULATIONS FROM ATWOOD HINZMAN JONES, FORWARDED SAME TO MIKE PHILLIPS. DAR 2/11/99
Routing - PUBLIC WORKS2/4/1999 2/5/1999 PASS
Plan resubmittals received  2/4/1999
RECEIVED THREE COPIES OF REVISED STRUCTURAL SHEETS S1.1, S2.1, S2.2, S2.3, S3.1, S3.2, S3.3, S4.1. ROUTED ONE COPY TO OUTSIDE ENG. AND TWO COPIES TO MIKE P. ALSO RECEIVED COMMENT RESPPONSES WITH ADDITIONAL CALCS. KMM
Routing - PLAN CHECK2/2/1999 2/4/1999
Routing - PLAN CHECK12/29/1998 2/2/1999 PEND
Routing - PLANNING2/2/1999 2/2/1999 PASS
Site plan and parking plan approved as per revised plans submitted December 16, 1998. Revised plans included in cup98-0098 file. TAC Revised plans for the Design Review have been submitted (DRH98-0131).
Plan resubmittals received  1/27/1999
Received particial waiting for structural comments to be submnitted.
Routing Off Site - STRUCTURAL12/2/1998 12/31/1998
CONTACTED PDQ TO TAKE PLANS OUT TO ENG.
Routing - FIRE12/23/1998 12/29/1998 PASS
not reviewed by UBC yet
Routing - PLUMBING12/16/1998 12/22/1998 PASS
Routing - PUBLIC WORKS12/2/1998 12/10/1998 FAIL
REQUIRES DRAINAGE PLAN APPROVAL PER BRIAN MURPHY
Plan routing begun/NEW & ADDTN12/2/1998 12/2/1998
Plan assigned to (MYS)12/1/1998 12/2/1998
DetailsMarlene Southard
Received Certificate of Value  12/2/1998 PASS
11-30-98 REQUIRED SEPARATING FOUND. GRADING AND CLUBHOUSE. VALUES.
Plans ACCEPTED BY PLAN TECH  12/2/1998 PASS
11-30-98 REQUIRED CALLING OUT WITH SEPARATE PERMITS - FOUNDATION, GRADING AND DRAINAGE, AND CLUBHOUSE. KMM 12-01-98 REQUIRES ONE MORE COPY OF STRUCT. CALCS. KMM
Recd Pcfee & Taken To Pln CK  12/1/1998
Application received  11/30/1998 PASS