Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD98-03832
StatusFinaled
Name MICRON TECH
Site Address 8000 S FEDERAL WAY
Project NameMIC #32(N2 GAS GEN)
Customer Number 
ePlanReviewNo
Description
MICRON BUILDING #32-BULK N2 GAS GENERATOR ENCLOSURE (32-982308) TO CONSTRUCT A NEW 635 SQ. FT., ONE STORY PRE-ENGINEERED STEEL BUILDING WITH CONCRETE FOUNDATION TO ENCLOSE AN N2 GENERATION PLANT. THIS BUILDING IS AN ADDITION TO MICRON BUILDING #32, LOCATED ON THE NORTHEAST CORNER OF BUILDING #32. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. NOTE: THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. CZC98-0204/PC#859-98/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/6/1999 10/29/1999 DONE
5000.00 additional fees for fire sprinkler
Letter of compliance  10/19/1999 DONE
Letter of Compliance #17932 issued 10-19-99.
INSP - Final8/31/19999/3/19999/3/1999APASS
DetailsJim Storey
09/03/99 301 - Scheduled by Hello!. Contact phone is [3681283].
CHANGE STATUS TO (I)  8/21/1999
Code Occupancy Approval  7/27/1999 PASS
ALL CONDITIONS OF CZC98-0204 (NONE) HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
INSP-Final Inspection5/4/19995/4/19995/4/1999PPASS
DetailsRick Jackson
occ approved
Receive PAYMENT IN FULL  3/8/1999
INSP - Framing/Rough-in2/12/19992/16/19992/16/1999APART
DetailsJim Storey
02/16/99 301 - GEN -GENERAL INSPECTION demo and framining ok.
Received partial PAYMENT  2/2/1999
Inspection Record Card- Bld  12/23/1998
Issue & PRINT FEE-DUE permit  12/23/1998
Print Occupancy Form  12/23/1998
Telephone call  12/23/1998
CALLED PERMIT READY
Plan assigned to (JCM)12/14/1998 12/22/1998 PASS
DetailsJohn Menard
Routing - PLAN CHECK12/22/1998 12/22/1998 PASS
Routing - FIRE12/22/1998 12/22/1998 PASS
Routing - PUBLIC WORKS12/21/1998 12/22/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/22/1998 PASS
Plan resubmittals received  12/21/1998
RECEIVED 5 COPIES OF CIVIL SHEETS C2.2 FOR BRIAN M. AND ONE COPY OF PRE-ENGINEERED STEEL BUILDING SYSTEMS MANUEL AND TWO COPIES OF STEEL PLANS. ROUTED TO JOHN M.
Routing - PLAN CHECK12/18/1998 12/21/1998 PEND
Routing - PLANNING12/18/1998 12/18/1998 PASS
X-ref. CZC98-204
Routing - PLUMBING12/17/1998 12/18/1998 PASS
Routing - PUBLIC WORKS12/14/1998 12/17/1998 FAIL
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. DAR 12/17/98
Plans ACCEPTED BY PLAN TECH  12/15/1998 PASS
received eng. for building. kmm
Plan routing begun/NEW & ADDTN  12/14/1998 PASS
Plans ACCEPTED BY PLAN TECH  12/11/1998 PEND
12-11-98 REQUIRES ENG. FOR BUILDING. CONTACTED DAVE WHITE OF THIS NEED. HOWEVER I WILL ROUTE TO PW AND P&Z.
Received Certificate of Value  12/11/1998 PASS
Application received  12/11/1998 PASS