BLD-Final | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | PASS |
Alan Hauser
|
|
|
###-#### DALE C/C #18236.
|
BLD-Final | 12/13/1999 | 12/15/1999 | 12/15/1999 | A | FAIL |
|
|
|
seal all penetrations of the exterior envelope i.e. dwv through wall at the sinks in the ext wall (2) attic access sealed gasket required by B.C.E.C. (3) SEAL AROUND THE CAN LIGHTS IN THE CEILINGS TO THE ATTIC. (4) whole house fan not operable. 338 explained the c/n to the contr.
|
INSP - Framing/Rough-in | 8/19/1999 | 8/19/1999 | 8/19/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Energy code compliance | 8/17/1999 | 8/18/1999 | 8/18/1999 | P | PASS |
Jim Sly
|
|
|
08/18/99 316 -
|
INSP - Framing/Rough-in | 8/16/1999 | 8/17/1999 | 8/17/1999 | A | FAIL |
Jim Sly
|
|
|
08/17/99 316 - C/N...Truss corr
|
INSP - Framing/Rough-in | 7/27/1999 | 7/28/1999 | 7/28/1999 | P | PART |
Jim Sly
|
|
|
07/28/99 316 - Shear wall OK
|
INSP - Foundation | 7/7/1999 | 7/8/1999 | 7/8/1999 | A | PASS |
Jim Sly
|
|
|
07/08/99 316 -
|
INSP - Foundation | 7/8/1999 | 7/8/1999 | 7/8/1999 | P | PASS |
Jim Sly
|
|
|
07/08/99 316 -
|
INSP - Foundation | 7/8/1999 | 7/8/1999 | 7/8/1999 | | PASS |
Jim Sly
|
|
|
07/08/99 316 -
|
INSP - Foundation | 7/7/1999 | 7/7/1999 | 7/7/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - FOOT, REBAR, SOIL, SETBKS APPEAR OK
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/7/1999 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 7/7/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/7/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/1999 | | |
|
|
|
|
Plan assigned to (DJO) | 6/23/1999 | | 7/7/1999 | | PASS |
Dan Overy
|
|
|
07/07/99 09:15:02 DJO - this action updated by action script from <<>> in Case No. BLD99-1852
|
Routing - PUBLIC WORKS | 6/23/1999 | | 6/24/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 6/23/1999 | | 6/23/1999 | | PASS |
|
|
|
|
Application received | | | 6/23/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 6/24/1999 | | | | PEND |
|
|
|
|