Case Summary (BLD) | | | 9/4/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/29/2005 | | |
|
|
|
|
Plan resubmittals received | | | 7/10/2002 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM DENNIS ROBINSON CM COMPANY, FORWARDED SAME TO MIKE PHILLIPS.PLANS SHOW TWO NEW STREET LIGHTS. 9/8/99 DAR
|
Plan resubmittals received | | | 5/23/2002 | | DONE |
|
|
|
|
Fee Review-notes | | | 5/16/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 5/9/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8225 issued 5-9-00 to Delta Dental.
|
Permanent Occupancy | | 4/28/2000 | 4/28/2000 | | DONE |
|
|
|
|
BLD-Final | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PASS |
Jim Storey
|
|
|
Dan ###-#### final ok 4/28/00 9:21:59 AM
|
Code Occupancy Approval | | | 4/26/2000 | | PASS |
|
|
|
FINAL SIGNED OFF, ALL LAND SCAPE IN AS REQUIRED.
|
FIRE-Final Inspection | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | PASS |
Rick Jackson
|
|
|
###-####
|
FIRE-Final Inspection | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Rick Jackson
|
|
|
Dan ###-#### Security egress doors not working. 3/28/00 8:52:34 AM
|
BLD-Final | 3/23/2000 | 3/24/2000 | 3/24/2000 | P | PART |
Jim Storey
|
|
|
Dan ###-#### ada signage at restarooms , pending other sign offs. temp occ ok 3/24/00 2:50:08 PM
|
FIRE-Final Inspection | 3/24/2000 | 3/24/2000 | 3/24/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### Egress doors not working. 3/27/00 10:08:41 AM
|
FIRE-Final Inspection | 3/22/2000 | 3/22/2000 | 3/22/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### Egress doors not working. 3/23/00 9:03:04 AM
|
Code Occupancy Approval | | | 3/21/2000 | | FAIL |
|
|
|
NO LANDSCAPE NOR PARKING LOT MARKINGS IN PLACE, BOND POSTED FOR $33,932.80 AND TEMPORARY OCCUPANCY SIGNED OFF.
|
FIRE-Conference | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | PART |
Rick Jackson
|
|
|
Dan ###-#### Exit lights; duct detectors; egress controls on exit. 2/29/00 3:04:41 PM
|
BLD-Framing/Rough-in | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | PART |
|
|
|
###-#### dan madeok to drop in the ceiling tiles 2/23/00 11:00:51 AM
|
BLD-Framing/Rough-in | 2/11/2000 | 2/14/2000 | 2/14/2000 | A | PASS |
Jim Storey
|
|
|
ceiling \\###-#### Beam covered w/gyp. ok. 2/14/00 2:27:40 PM
|
BLD-Conference | 2/1/2000 | 2/2/2000 | 2/2/2000 | A | PART |
Jim Storey
|
|
|
Dan ###-#### fire collors on piping ok thru 1 hr roof syst. c\n pending on how gib is to be 1 hr protected as wellas sadles for beams, subital reg for approval 2/3/00 9:44:36 AM
|
BLD-Framing/Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PART |
Jim Storey
|
|
|
FIRE CAULKING--RE-INSP- DAN-- ###-#### Waiting for submittal for column & beam 1hr protection/ plumbing penetration 1 ok 2 failed at ceiling collor not installed correctly. 1/19/00 10:54:06 AM
|
BLD-Framing/Rough-in | 1/7/2000 | 1/11/2000 | 1/11/2000 | A | PART |
Jim Storey
|
|
|
Dan CM company ###-#### Fire damper/beam & co lwrap/ plastic pipe 3 loc.
|
BLD-Framing/Rough-in | 12/15/1999 | 12/15/1999 | 12/15/1999 | A | PART |
Jim Storey
|
|
|
SHEETROCK DAN ###-#### Received eng. Letter to address C/N ok archived letter.
|
BLD-Framing/Rough-in | 12/10/1999 | 12/13/1999 | 12/13/1999 | P | FAIL |
Jim Storey
|
|
|
###-####-dan fr insp C/N.
|
BLD-Framing/Rough-in | 12/6/1999 | 12/8/1999 | 12/8/1999 | A | NR |
Russ Owen
|
|
|
nailing\###-#### Frost on roof, will recall when complete.
|
BLD-Framing/Rough-in | 12/8/1999 | 12/8/1999 | 12/8/1999 | P | PART |
Jim Storey
|
|
|
ROOF NAILING-- ###-####-DAN Deck nailing on roof deck ok.
|
BLD-Framing/Rough-in | 12/3/1999 | 12/3/1999 | 12/3/1999 | A | PART |
Jim Storey
|
|
|
Exterior shear nailing ok per approved plan ok to cover exterior of Bld.
|
BLD-Framing/Rough-in | 12/2/1999 | 12/2/1999 | 12/2/1999 | P | FAIL |
Jim Storey
|
|
|
shear wall dan ###-#### voice pager Sheer nailing C/N.
|
Additional plans submitted | | | 11/18/1999 | | PEND |
|
|
|
RECEIVED DELAYED SUBMITTAL ON TRUSSES FROM CM COMPANY, FORWARDED SAME TO JIM STOREY. 11/18/99 DAR
|
BLD-Footing | 10/15/1999 | 10/19/1999 | 10/19/1999 | A | PART |
Wes Worcester
|
|
|
dan ###-#### Met w/contractor; MTI onsite.. 301 area.
|
Print Pending Permit.LaserJet4 | | | 9/24/1999 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/24/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/23/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/1999 | | DONE |
|
|
|
|
Telephone call | | | 9/13/1999 | | DONE |
|
|
|
called Dennis Robinson at ###-#### and left a message for him
|
Routing - PLAN CHECK | 9/9/1999 | 9/9/1999 | 9/10/1999 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/10/1999 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/1999 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/10/1999 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/10/1999 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/21/1999 | | 9/10/1999 | | PASS |
Mike Phillips
|
|
|
9/10/1999 16:42:54 M_P - activity updated through activity BLDA022 from case BLD99-02180.
|
Routing - PLAN CHECK | 8/13/1999 | | 9/10/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/8/1999 | 9/8/1999 | 9/9/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/3/1999 | | 9/8/1999 | | PEND |
|
|
|
Routing to Public Works with resubmittals.
|
Routing - PLANNING | 9/3/1999 | | 9/3/1999 | | PASS |
|
|
|
approved per DRH99-2180.
|
Routing - FIRE | 8/10/1999 | | 8/11/1999 | | PASS |
|
|
|
FED EXED OFFICE COPY TO FLOYD AND ROUTED ISSUE COPY TO MIKE P. KMM
|
Plan Review Completed(1st rev) | | | 8/11/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 8/5/1999 | | 8/9/1999 | | |
|
|
|
rOUTING TO FIRE DEPARTMETN FOR REVIEW.
|
Plan resubmittals requested | | | 8/9/1999 | | FAIL |
|
|
|
rEQUESTING STRUCTURAL PLANS TO BE MODIFIED TO MATCH CALCULATIONS.
|
Routing - PLAN CHECK | 7/28/1999 | | 8/6/1999 | | |
|
|
|
Distroyed original plans that were submitted.
|
Routing - PLUMBING | 8/5/1999 | | 8/5/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 8/4/1999 | | 8/5/1999 | | FAIL |
|
|
|
plans do not comply with Design Review conditions of approval (see letter dated July 28, 1999 in DRH99-0092 file).
|
Routing - PUBLIC WORKS | 8/2/1999 | | 8/4/1999 | | FAIL |
|
|
|
REQUIRES STREET LIGHT PLAN PER BILL COLSON. 8/4/99 DAR
|
Plan resubmittals received | | | 8/2/1999 | | PEND |
|
|
|
RECEIVED COMPLETE PLAN RESUBMITTALS FROM MATT, ZGA ARCHITECTS. ADVISED HIM PROJECT WAS JUST STARTING OVER LIKE A NEW PROJECT. 8/2/99 DAR Changed date to the second not thew twenty ninth.mjp
|
Routing - PLANNING | 7/27/1999 | | 7/28/1999 | | FAIL |
|
|
|
plans do not comply with Design Review conditions (see letter dated July 28, 1999 in DRH99-0092 file).
|
Routing - PLUMBING | 7/27/1999 | | 7/27/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/21/1999 | | 7/27/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 7/27/99 DAR
|
Plan assigned to (MYS) | 7/20/1999 | | 7/21/1999 | | PASS |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | 7/21/1999 | | 7/21/1999 | | |
|
|
|
|
Application received | | | 7/20/1999 | | |
|
|
|
|