Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD99-02180
StatusFinaled
Name DENNIS ROBINSON
Site Address 555 E PARKCENTER BLVD
Project NameDELTA DENTAL OFFICE
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 11,810 SQ. FT, SINGLE STORY, WOOD FRAMED, TYPE V ONE-HOUR, OFFICE BUILDING. 9410 SQUARE FEET OF OFFICE SPACE IS BEING FINISHED WITH BUILDING CONSTRUCTION; 2400 SQUARE FEET WILL BE TENANT SPACE UNFINISHED WITH BUILDING CONSTRUCTION SHELL. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. PERMIT TO LAND SCAPING AND PARKING LOT. ADDITIONAL PERMIT AND CERTIFICATE OF OCCUPANCY REQUIRED TO FINISH THE 2400 SQ.FT. LEASE SPACE. GRADING PERMIT #99-2107. MJP DRH99-0092, P.C.# 557-99
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/4/2013 DONE
Case Summary (BLD)  6/29/2005  
Plan resubmittals received  7/10/2002 DONE
PLAN RESUBMITTALS RECEIVED FROM DENNIS ROBINSON CM COMPANY, FORWARDED SAME TO MIKE PHILLIPS.PLANS SHOW TWO NEW STREET LIGHTS. 9/8/99 DAR
Plan resubmittals received  5/23/2002 DONE
Fee Review-notes  5/16/2000 DONE
Permanent occupancy UNPAID FEE  5/9/2000 DONE
Perm. Occ. Cert. #8225 issued 5-9-00 to Delta Dental.
Permanent Occupancy 4/28/20004/28/2000 DONE
Details
BLD-Final4/27/20004/28/20004/28/2000APASS
DetailsJim Storey
Dan ###-#### final ok 4/28/00 9:21:59 AM
Code Occupancy Approval  4/26/2000 PASS
FINAL SIGNED OFF, ALL LAND SCAPE IN AS REQUIRED.
FIRE-Final Inspection3/29/20003/29/20003/29/2000PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection3/24/20003/27/20003/27/2000AFAIL
DetailsRick Jackson
Dan ###-#### Security egress doors not working. 3/28/00 8:52:34 AM
BLD-Final3/23/20003/24/20003/24/2000PPART
DetailsJim Storey
Dan ###-#### ada signage at restarooms , pending other sign offs. temp occ ok 3/24/00 2:50:08 PM
FIRE-Final Inspection3/24/20003/24/20003/24/2000PFAIL
DetailsRick Jackson
###-#### Egress doors not working. 3/27/00 10:08:41 AM
FIRE-Final Inspection3/22/20003/22/20003/22/2000PFAIL
DetailsRick Jackson
###-#### Egress doors not working. 3/23/00 9:03:04 AM
Code Occupancy Approval  3/21/2000 FAIL
NO LANDSCAPE NOR PARKING LOT MARKINGS IN PLACE, BOND POSTED FOR $33,932.80 AND TEMPORARY OCCUPANCY SIGNED OFF.
FIRE-Conference2/28/20002/28/20002/28/2000PPART
DetailsRick Jackson
Dan ###-#### Exit lights; duct detectors; egress controls on exit. 2/29/00 3:04:41 PM
BLD-Framing/Rough-in2/22/20002/23/20002/23/2000APART
Details
###-#### dan madeok to drop in the ceiling tiles 2/23/00 11:00:51 AM
BLD-Framing/Rough-in2/11/20002/14/20002/14/2000APASS
DetailsJim Storey
ceiling \\###-#### Beam covered w/gyp. ok. 2/14/00 2:27:40 PM
BLD-Conference2/1/20002/2/20002/2/2000APART
DetailsJim Storey
Dan ###-#### fire collors on piping ok thru 1 hr roof syst. c\n pending on how gib is to be 1 hr protected as wellas sadles for beams, subital reg for approval 2/3/00 9:44:36 AM
BLD-Framing/Rough-in1/18/20001/18/20001/18/2000PPART
DetailsJim Storey
FIRE CAULKING--RE-INSP- DAN-- ###-#### Waiting for submittal for column & beam 1hr protection/ plumbing penetration 1 ok 2 failed at ceiling collor not installed correctly. 1/19/00 10:54:06 AM
BLD-Framing/Rough-in1/7/20001/11/20001/11/2000APART
DetailsJim Storey
Dan CM company ###-#### Fire damper/beam & co lwrap/ plastic pipe 3 loc.
BLD-Framing/Rough-in12/15/199912/15/199912/15/1999APART
DetailsJim Storey
SHEETROCK DAN ###-#### Received eng. Letter to address C/N ok archived letter.
BLD-Framing/Rough-in12/10/199912/13/199912/13/1999PFAIL
DetailsJim Storey
###-####-dan fr insp C/N.
BLD-Framing/Rough-in12/6/199912/8/199912/8/1999ANR
DetailsRuss Owen
nailing\###-#### Frost on roof, will recall when complete.
BLD-Framing/Rough-in12/8/199912/8/199912/8/1999PPART
DetailsJim Storey
ROOF NAILING-- ###-####-DAN Deck nailing on roof deck ok.
BLD-Framing/Rough-in12/3/199912/3/199912/3/1999APART
DetailsJim Storey
Exterior shear nailing ok per approved plan ok to cover exterior of Bld.
BLD-Framing/Rough-in12/2/199912/2/199912/2/1999PFAIL
DetailsJim Storey
shear wall dan ###-#### voice pager Sheer nailing C/N.
Additional plans submitted  11/18/1999 PEND
RECEIVED DELAYED SUBMITTAL ON TRUSSES FROM CM COMPANY, FORWARDED SAME TO JIM STOREY. 11/18/99 DAR
BLD-Footing10/15/199910/19/199910/19/1999APART
DetailsWes Worcester
dan ###-#### Met w/contractor; MTI onsite.. 301 area.
Print Pending Permit.LaserJet4  9/24/1999 DONE
Print Pending Permit.LaserJet4  9/24/1999 DONE
Issue PAID IN FULL permit  9/23/1999 DONE
Inspection Record Card- Bld  9/13/1999 DONE
Print Occupancy Form  9/13/1999 DONE
Telephone call  9/13/1999 DONE
called Dennis Robinson at ###-#### and left a message for him
Routing - PLAN CHECK9/9/19999/9/19999/10/1999 DONE
Plan Reviewer's activity  9/10/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/10/1999 DONE
Print Pending Permit.LaserJet4  9/10/1999 DONE
Case Summary (BLD)  9/10/1999 DONE
Plan assigned to (M_P)7/21/1999 9/10/1999 PASS
DetailsMike Phillips
9/10/1999 16:42:54 M_P - activity updated through activity BLDA022 from case BLD99-02180.
Routing - PLAN CHECK8/13/1999 9/10/1999 DONE
Routing - PUBLIC WORKS9/8/19999/8/19999/9/1999 PASS
Routing - PLAN CHECK9/3/1999 9/8/1999 PEND
Routing to Public Works with resubmittals.
Routing - PLANNING9/3/1999 9/3/1999 PASS
approved per DRH99-2180.
Routing - FIRE8/10/1999 8/11/1999 PASS
FED EXED OFFICE COPY TO FLOYD AND ROUTED ISSUE COPY TO MIKE P. KMM
Plan Review Completed(1st rev)  8/11/1999
Routing - PLAN CHECK8/5/1999 8/9/1999
rOUTING TO FIRE DEPARTMETN FOR REVIEW.
Plan resubmittals requested  8/9/1999 FAIL
rEQUESTING STRUCTURAL PLANS TO BE MODIFIED TO MATCH CALCULATIONS.
Routing - PLAN CHECK7/28/1999 8/6/1999
Distroyed original plans that were submitted.
Routing - PLUMBING8/5/1999 8/5/1999 PASS
Routing - PLANNING8/4/1999 8/5/1999 FAIL
plans do not comply with Design Review conditions of approval (see letter dated July 28, 1999 in DRH99-0092 file).
Routing - PUBLIC WORKS8/2/1999 8/4/1999 FAIL
REQUIRES STREET LIGHT PLAN PER BILL COLSON. 8/4/99 DAR
Plan resubmittals received  8/2/1999 PEND
RECEIVED COMPLETE PLAN RESUBMITTALS FROM MATT, ZGA ARCHITECTS. ADVISED HIM PROJECT WAS JUST STARTING OVER LIKE A NEW PROJECT. 8/2/99 DAR Changed date to the second not thew twenty ninth.mjp
Routing - PLANNING7/27/1999 7/28/1999 FAIL
plans do not comply with Design Review conditions (see letter dated July 28, 1999 in DRH99-0092 file).
Routing - PLUMBING7/27/1999 7/27/1999 PASS
Routing - PUBLIC WORKS7/21/1999 7/27/1999 FAIL
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 7/27/99 DAR
Plan assigned to (MYS)7/20/1999 7/21/1999 PASS
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH7/21/1999 7/21/1999
Application received  7/20/1999