Final | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/13/2005 at 9:09:29 AM. Contact: ###-####.
|
Permanent Service | 8/24/2005 | 8/25/2005 | 8/25/2005 | P | CANC |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 8/24/2005 at 9:17:27 PM. Contact: ###-####. wrong type inspection
|
Final | 8/25/2005 | 8/25/2005 | 8/25/2005 | P | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 8/24/2005 at 9:17:27 PM. Contact: ###-####. outside boxes need to be secured & inused covers, & bonding pipe clamps need to be secured properly. lable panal directory
|
Electrical Rough-In | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 10:01:47 AM. Contact: ###-####.
R/I Ok
change service to 4 wire and bond water 2/10/2005 2:09:30 PM
|
Electrical Rough-In | 12/28/2004 | 12/29/2004 | 12/29/2004 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 4:42:21 PM. Contact: ###-####. cow home owner made more problems since last inspection (did not complete corrections) romex surface mounted, box fill, 6inch free conduct, did not use connectors for boxes, framing not completed, bathrm curcuit used for other wiring, & stapleing for romex not correct. advised he to get books or contractor to do the job. no under ground inspection for service. permit does not have service fees.
did not look at service connection at main panal.
12/29/2004 10:29:42 AM 12/29/2004 10:40:09 AM
|
Electrical Rough-In | 12/21/2004 | 12/22/2004 | 12/22/2004 | A | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 2:49:00 PM. Contact: ###-####.
correction posted
334.30, 314.17, 314.29, 334.24 12/22/2004 9:32:30 AM
|
Conference | 10/31/2004 | 11/1/2004 | 11/1/2004 | A | DONE |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/31/2004 at 9:37:19 AM. Contact: ###-####.
talked about clearances, 1 1/4", conductor length
11/1/2004 10:59:39 AM
|
Application received | | | 9/2/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/2/2004 | | DONE |
|
|
|
|