Final | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | PASS |
Jack Frank
|
|
|
###-####. Scheduled by a contractor via Hello! on 5/13/2005 at 4:38:58 PM. Contact: ###-####.
|
Final | 5/11/2005 | 5/12/2005 | 5/12/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 4:31:15 PM. Contact: ###-####. cor. posted called 250.66 all grds and bonds shall be #4 copper, 250.104 bond hot and cold at both water heaters, remove old grd from jbox 5/12/2005 8:58:46 AM
|
Final | 1/31/2005 | 1/31/2005 | 1/31/2005 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 9:00:22 AM. Contact: ###-####. see added p/s 1/31/2005 3:24:09 PM
|
Permanent Service | 1/31/2005 | 1/31/2005 | 1/31/2005 | P | PASS |
Jack Frank
|
|
|
p/s o/h rec. ok
|
Application received | | | 1/25/2005 | | |
|
|
|
|
Issue permit | | | 1/25/2005 | | DONE |
|
|
|
|