Final | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/22/2006 at 7:53:37 AM. Contact: ###-####. left survey, called contr, nec 406.5 and 404.9 faceplates shall seat against finished surface,406.4(D) recpt faces shall be flush with or project from faceplates, ok to final
|
Rough-In Permanent Service | 5/10/2006 | 5/11/2006 | 5/11/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 1:53:07 PM. Contact: ###-####. corr made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 5/8/2006 | 5/10/2006 | 5/10/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/8/2006 at 9:09:47 PM. Contact: ###-####. called contr, left message, left corr notice, nec 312.5 all conductors entering enclosures shall have abrasion protection,210.52(H) recpt shall be in hall over 10', 210.63 recpt shall be within 25' of a/c, BCC all make-up shall be done
|
Application received | | | 5/4/2006 | | |
|
|
|
|
Issue permit | | | 5/4/2006 | | DONE |
|
|
|
|