Final | 8/1/2006 | 8/1/2006 | 8/1/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 8:06:45 AM. Contact: ###-####. corr made, ok to final
|
Final | 7/27/2006 | 7/28/2006 | 7/28/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/27/2006 at 2:19:21 PM. Contact: ###-####. called, left message, left correction notice, fee due, nec 110.12(C) there shall be no broken parts(garage recpt faceplate) 410.8(D) upper closet fixture shall not be closer than 12" to point of storage over shelves, 410.12 fixture shall be installed to box in bath,406.4 recpt in front shall be mounted in box w/ wp cover
|
Rough-In Permanent Service | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 4:49:58 PM. Contact: ###-####. corr made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 6/12/2006 | 6/12/2006 | 6/12/2006 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 9:56:55 AM. Contact: ###-####. called corrections not made still needs 11/4"
|
Rough-In Permanent Service | 6/8/2006 | 6/12/2006 | 6/12/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/8/2006 at 12:38:31 PM. Contact: ###-####. called , left message, nec 300.4(D) edge of nm cable shall be 1 1/4" from edge of framing member, mbr area 210.52(A)(1) recpts shall be installed so no point is over 6' from outlet along wall line fr br, dr,great room up, 210.52(D) recpt shall be within 3' of basin up bath,BCC all make-up shall be done
|
Application received | | | 5/31/2006 | | |
|
|
|
|
Issue permit | | | 5/31/2006 | | DONE |
|
|
|
|