Third Notice ELE | 6/21/2007 | 6/21/2007 | 7/9/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 5/29/2007 | 5/29/2007 | 6/21/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 5/17/2007 | 5/17/2007 | 5/29/2007 | | DONE |
Bob Reichert
|
|
|
|
Final | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | PASS |
Bob Reichert
|
|
|
chad - pls call for the code; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to final
|
Rough-In Permanent Service | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PASS |
Bob Reichert
|
|
|
chad - re-inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ric ok, p/s u/g n ok
|
Electrical Rough-In | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | NR |
Bob Reichert
|
|
|
chad ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith called contr to open south side drive u/g more and finish nail plates and nm 1 1/4"
|
Rough-In Permanent Service | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | FAIL |
Jack Frank
|
|
|
Chad, these are duplexes wired as townhouses; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt 300.4 nail plate and 11/4", 210.52(A) outlet spacing Mbed rm each unit by slider and outlet and 2ft wall, also where din. and liv rm meet kit circuit shall not serve liv rm, duplex being built as townhouse ,shall have p/s on each unit called
|
Application received | | | 12/12/2006 | | |
|
|
|
|
Issue permit | | | 12/12/2006 | | DONE |
|
|
|
|