Second Notice ELE | 3/3/2009 | 3/3/2009 | 3/18/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
First Notice has not been responded to.
|
First Notice | 11/21/2008 | 11/21/2008 | 3/3/2009 | | DONE |
Jack Frank
|
|
|
|
Final | 11/21/2008 | 11/21/2008 | 11/21/2008 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Paige ok card signed
|
Final | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | CANC |
Jack Frank
|
|
|
ceiling cover last two rooms Phone #: ###-#### Internet Inspection Request from: Karl Paige see added r/i
|
Electrical Rough-In | 11/5/2008 | 11/5/2008 | 11/5/2008 | A | PART |
Jack Frank
|
|
|
ceiling cover last two rooms Phone #: ###-#### Internet Inspection Request from: Karl Paige ok anop
|
Electrical Rough-In | 11/1/2008 | 11/3/2008 | 11/3/2008 | A | PART |
Jack Frank
|
|
|
ceiling inspection for cover Phone #: ###-#### Internet Inspection Request from: Karl Paige r/i ok anop
|
Electrical Rough-In | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | CANC |
Jack Frank
|
|
|
ceiling cover in data room Phone #: ###-#### Internet Inspection Request from: Karl Paige ok
|
Electrical Rough-In | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | PART |
Jack Frank
|
|
|
see Steve N questions on fixtures and xformers ok and r/i for soffit conference rm
|
Electrical Rough-In | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | CANC |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Paige called will do in AM contr leaves at 3:45PM called
|
Electrical Rough-In | 9/8/2008 | 9/9/2008 | 9/9/2008 | A | PART |
Pat Lass
|
|
|
STEVE Phone #: ###-#### walls anop
|
Override - Parcel Holds | 9/8/2008 | 1/1/1900 | 9/8/2008 | | |
|
|
|
WE ARE DOING R/I ONLY
|
Electrical Rough-In | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PART |
Jack Frank
|
|
|
Steve Phone #: ###-#### 3 walls in elect. rm
|
Override - Parcel Holds | 9/4/2008 | 1/1/1900 | 9/4/2008 | | |
|
|
|
ele only
|
Electrical Rough-In | 8/18/2008 | 8/18/2008 | 8/18/2008 | P | PASS |
Bob Reichert
|
|
|
Jack, The walls are the ones they were working on when you checked the service by the electrical rooms. Karl Phone #: ###-#### Internet Inspection Request from: Karl Paige walls only anop ok to cover
|
Permanent Service | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Paige p/s u/g new ok on temp basis for testing equipment
|
Electrical Rough-In | 8/11/2008 | 8/11/2008 | 8/11/2008 | A | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Paige walls anop
|
Electrical Rough-In | 8/6/2008 | 8/6/2008 | 8/6/2008 | P | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Paige ok anop
|
Electrical Rough-In | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Karl Paige walls anop
|
Electrical Rough-In | 7/22/2008 | 7/22/2008 | 7/22/2008 | P | CANC |
William E Thomas
|
|
|
steve Phone #: ###-#### . .1. as noted on prints ok. . .
|
Electrical Rough-In | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PART |
Bob Reichert
|
|
|
New wall inspection inside existing building. Phone #: ###-#### Internet Inspection Request from: Karl Paige ok to cover all walls except north wall of big room
|
Conference | 4/24/2008 | 4/24/2008 | 4/24/2008 | A | DONE |
Jack Frank
|
|
|
job ok for more than 0ne service based on size of p/s over 2000 amps shall provide required plauges and all electrodes tied together
|
Electrical Rough-In | 4/22/2008 | 4/23/2008 | 4/23/2008 | A | PART |
Jack Frank
|
|
|
Uffer ground. Pouring concrete at 10:00 am on the 23rd Phone #: ###-#### Internet Inspection Request from: Karl Paige ok
|
Conference | 4/23/2008 | 4/23/2008 | 4/23/2008 | A | DONE |
Jack Frank
|
|
|
conferenceon services and number of services allowed existing service shall become sub gear from new services, and connect all electrodes together so all GEC and bonds terminate at new service location
|
Electrical Rough-In | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/18/2008 at 2:01:17 PM. Contact: ###-####. 2nd level of u/g ok
|
Electrical Rough-In | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/28/2008 at 2:56:38 PM. Contact: ###-####. 1st level of u/g duct banks ok
|
Application received | | | 2/7/2008 | | DONE |
|
|
|
This permit was created on the web by Vicki Moore
|