Final | 9/22/2009 | 9/23/2009 | 9/23/2009 | A | PASS |
Bob Reichert
|
|
|
Brian Phone #: ###-#### ok to final, signed card
|
Electrical Rough-In | 11/20/2008 | 11/21/2008 | 11/21/2008 | P | PASS |
Bob Reichert
|
|
|
bryan - please call 1/2 hr prior Phone #: ###-#### ok to final
|
Rough-In Permanent Service | 11/17/2008 | 11/18/2008 | 11/18/2008 | P | PASS |
Bob Reichert
|
|
|
brian Note: please call 1/2 hr priro to inspection Phone #: ###-#### corrections made, ric ok, p/s o/h n ok
|
Electrical Rough-In | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | FAIL |
Jack Frank
|
|
|
Brian Phone #: ###-#### met contr needs GEC from p/s to concrete encased electrode, staple cables within 8" of plastic boxes, 12" of subpanel
|
Application received | | | 8/11/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/11/2008 | | DONE |
|
|
|
|