First Notice | 11/7/2008 | 11/7/2008 | 3/3/2009 | | DONE |
Bob Reichert
|
|
|
|
Final | 11/6/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Bob Reichert
|
|
|
Hi Pat, There''s not much to look at but we are ready, if you remember we added some receps in a couple of walls in the small offices, added receps in the new wall in the breakroom, and added some receps and a new light in the conference room, I think this was the bulk of it. If you have any questions I left Blakes cell number on the request, I will be out of town today. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig ok to final, signed structural card, no esc this project
|
Electrical Rough-In | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | PASS |
Pat Lass
|
|
|
Hi Pat, I need the conference room ceiling inspected for cover. The conference room is on the right hand side of the secretary''s office when you get off of the elevator. Please give me a call if you have any questions. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig
|
Electrical Rough-In | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Bob Reichert
|
|
|
Hi Pat, This is the remodel I met you at, its on the second floor of the building. I need the new wall inspected at the conference room, the conference room is on the right side of the secretary''s desk when you get off the elevator. Give me a call if you have any problems locating it. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig ric ok wall only to right of secretary, 2nd floor only, for conference room, no esc this project
|
Electrical Rough-In | 8/22/2008 | 8/25/2008 | 8/25/2008 | P | PART |
Pat Lass
|
|
|
Wayne Phone #: ###-####- call 30 min prior to going phase 1 R/I ok no esc in project
|
Application received | | | 8/22/2008 | | |
|
|
|
|
Issue permit | | | 8/22/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Second Notice ELE | 3/3/2009 | 3/3/2009 | | | |
|
|
|
First Notice has not been responded to.
|