Final | 6/17/2009 | 6/17/2009 | 6/17/2009 | A | PASS |
Bob Reichert
|
|
|
please give me a call so that I can make sure someone is home to let you in. Thanks Shaun 941 6264 Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman met contractor, ok to final
|
Electrical Rough-In | 4/10/2009 | 4/10/2009 | 4/10/2009 | A | PART |
Pat Lass
|
|
|
I am unclear if this inspection passed got an e-mail that said it did and one that said it was not ready. I have installed sensor and fished wires. Please cancel if inspection has been done. Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman floor heat ok
|
Electrical Rough-In | 4/8/2009 | 4/9/2009 | 4/9/2009 | A | NR |
Jack Frank
|
|
|
Please inspect tile floor mat in masterbathroom upstairs Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman called floor heat not ready
|
Reinspection Fee (no hold) | 4/9/2009 | 4/9/2009 | 4/9/2009 | A | PASS |
Jack Frank
|
|
|
Please inspect tile floor mat in masterbathroom upstairs Phone #: ###-#### Internet Inspection Request from: Shaun fee due job not ready
|
Electrical Rough-In | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/7/2008 at 10:52:01 AM. Contact: ###-####.
|
Rough-In Permanent Service | 11/7/2008 | 11/7/2008 | 11/7/2008 | A | PART |
Pat Lass
|
|
|
Will be ready after 9:00 am Thanks Shaun Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman upper floors R/I Ok P/S U/g R Ok
|
Electrical Rough-In | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 10:02:35 AM. Contact: ###-####. u/g ok
|
Electrical Rough-In | 10/30/2008 | 10/30/2008 | 10/30/2008 | A | FAIL |
Bob Reichert
|
|
|
Please inspect conduit from house to garage. Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman called contractor, NEC 300.5 u/g shall be min 18" deep
|
Conference | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/21/2008 at 10:10:11 AM. Contact: ###-####. talked about securing romex in foam insulation
|
Electrical Rough-In | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/23/2008 at 10:15:30 AM. Contact: ###-####. ok to backfill gec
|
Electrical Rough-In | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | CANC |
Pat Lass
|
|
|
please inspect groundign conductor Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman electrode ok for concrete
|
Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | CANC |
Pat Lass
|
|
|
please inspect grounding conductor Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman Inspection cancelled from web by: Shaun Kirkman
|
Application received | | | 9/18/2008 | | DONE |
|
|
|
This permit was created on the web by Shaun Kirkman
|