Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Doug A Poedy
|
|
|
Eric Phone #: ###-####. Ok final.
|
DOC - Permit Finaled | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PART |
Doug A Poedy
|
|
|
eric Phone #: ###-####. Partial cover of hot tub underground conduit.
|
Electrical Rough-In | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | PART |
Doug A Poedy
|
|
|
eric - trench Phone #: ###-####. Ok to cover portion of conduit.
|
Electrical Rough-In | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Mike Kinnear
|
|
|
eric Phone #: ###-#### ok cover floor heat master bath rm.
|
Electrical Rough-In | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | PASS |
Pat Lass
|
|
|
eric Phone #: ###-####
|
Permanent Service | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | PASS |
Pat Lass
|
|
|
eric Phone #: ###-#### P/S U/G N Ok
|
Application received | | | 1/20/2009 | | |
|
|
|
|
Issue permit | | | 1/20/2009 | | DONE |
|
|
|
|