Final | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PASS |
Doug A Poedy
|
|
|
russ Phone #: ###-####. Ok final.
|
Permanent Service | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PASS |
Doug A Poedy
|
|
|
russ Phone #: ###-####. Ok final.
|
DOC - Permit Finaled | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PASS |
Doug A Poedy
|
|
|
|
DOC - Permit Finaled | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 7/22/2009 | 7/22/2009 | 7/22/2009 | P | PART |
Doug A Poedy
|
|
|
Russ---late pm please Phone #: ###-####. Ok to cover walls and part ceiling.
|
Conference | 6/9/2009 | 6/10/2009 | 6/10/2009 | A | DONE |
Bob Reichert
|
|
|
jeff Phone #: ###-#### talked about repair for damaged aluminum, corroded conduit, should be ok to encase in concrete, no esc this project
|
Conference | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | DONE |
Bob Reichert
|
|
|
Russ Phone #: ###-#### met contractor, told that if they sleeve broken conduit, that material shall be listed by nationally recognized testing laboratory, looks like could run new feeder for about same effort, rather than get into concrete encased duct bank for repairs, no esc this project
|
Issue PAID IN FULL permit | | | 5/12/2009 | | DONE |
|
|
|
|
Application received | | | 5/12/2009 | | |
|
|
|
|
First Notice | 8/24/2009 | 8/24/2009 | | | |
Doug A Poedy
|
|
|
|
First Notice | 8/24/2009 | 8/24/2009 | | | |
Doug A Poedy
|
|
|
|
First Notice | 8/24/2009 | 8/24/2009 | | | |
Doug A Poedy
|
|
|
|