Final | 5/26/2010 | 5/27/2010 | 5/27/2010 | A | PASS |
Bob Reichert
|
|
|
Bill Davis Phone #: ###-#### ok to final
|
Electrical Rough-In | 10/30/2009 | 10/30/2009 | 10/30/2009 | P | PASS |
Bob Reichert
|
|
|
bill Phone #: ###-#### ric ok, no esc this project
|
Electrical Rough-In | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | CANC |
Bob Reichert
|
|
|
bill Phone #: ###-#### see conference, no esc this project
|
Conference | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | DONE |
Bob Reichert
|
|
|
bill Phone #: ###-#### talked about 6" free conductor, add receptacles in new walls, abrasion protection, ground metal boxes, make-up, 1 1/4", id switch wires, no esc this project
|
Conference | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | DONE |
Bob Reichert
|
|
|
bill Phone #: ###-#### talked about make-up, ground metal boxes, add receptacles in new walls, 1 1/4" for nm cable, using abrasion protection for nm cable in metal boxes, 6" free conductor, no esc this project
|
Conference | 7/6/2009 | 7/6/2009 | 7/6/2009 | P | DONE |
Bob Reichert
|
|
|
Bill ###-#### talked about ceiling fan, outlets, adding irrigation pump to permit, smoke detectors,
|
Application received | | | 6/12/2009 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/12/2009 | | DONE |
|
|
|
|