Final | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | PASS |
Doug A Poedy
|
|
|
steve- for 2nd & 4th floors Phone #: ###-####
|
DOC - Permit Finaled | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 2/8/2010 | 2/9/2010 | 2/9/2010 | A | PASS |
Bob Reichert
|
|
|
Steve-Reinspection on 1st floor ceiling please Phone #: ###-#### corrections made, ok to cover 1st floor ceiling only, no esc this project
|
Final | 2/4/2010 | 2/5/2010 | 2/5/2010 | A | FAIL |
Doug A Poedy
|
|
|
Steve Phone #: ###-####. Fire alarm conduits and boxes free floating and not strapped. KO seals need installed. Mc strapped to conduit.
|
Final | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | PART |
Doug A Poedy
|
|
|
final for 4th floor//Darren ###-####. Ok final 4th floor.
|
Electrical Rough-In | 12/31/2009 | 1/4/2010 | 1/4/2010 | A | PASS |
Bob Reichert
|
|
|
Steve for the 2nd floor Phone #: ###-#### ok to cover 2nd floor ceiling only, no esc this project
|
Electrical Rough-In | 12/29/2009 | 12/30/2009 | 12/30/2009 | A | PASS |
Doug A Poedy
|
|
|
steve - 4th floor Phone #: ###-#### Fourth floor ceiling ok to cover.
|
Electrical Rough-In | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PART |
Doug A Poedy
|
|
|
Steve Phone #: ###-####. Ok to cover 2nd floor walls.
|
Electrical Rough-In | 12/17/2009 | 12/17/2009 | 12/17/2009 | P | PASS |
Doug A Poedy
|
|
|
Darren Phone #: ###-####. Ok to cover walls 4th floor.
|
Application received | | | 12/17/2009 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|
First Notice | 4/23/2010 | 4/23/2010 | | | |
Doug A Poedy
|
|
|
|
First Notice | 4/23/2010 | 4/23/2010 | | | |
Doug A Poedy
|
|
|
|