Final | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | PASS |
Daryl DeGrange
|
|
|
jentry Phone #: ###-#### final ok
|
Electrical Rough-In | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PASS |
Daryl DeGrange
|
|
|
Jentry please call 30 min before going out as she is across town Phone #: ###-#### rough-in ok second floor addition-service conductors not installed
|
Electrical Rough-In | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | PASS |
Daryl DeGrange
|
|
|
Jentry-PLease call 30 MIns prior to inspection Phone #: ###-#### rough-in ok cover main floor remodel
|
Permanent Service | 7/15/2011 | 7/18/2011 | 7/18/2011 | P | PASS |
Daryl DeGrange
|
|
|
Josh Phone #: ###-#### p/s u/g rec ok existing ground rods covered under concrete slab, partial visual.Need to pour working platform for service height for final
|
Conference | 7/15/2011 | 7/15/2011 | 7/15/2011 | P | DONE |
Doug A Poedy
|
|
|
Josh Phone #: ###-####. Changing from overhead to underground service.
|
Application received | | | 7/15/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
|