Final | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | PASS |
Daryl DeGrange
|
|
|
REROUTED THE BOND WIRE TO THE SERVICE EQUIPMENT AS REQUESTED. Phone #: ###-#### >> Inspection requested via web by Justin Frates final ok
|
Final | 10/7/2012 | 10/8/2012 | 10/8/2012 | A | FAIL |
Daryl DeGrange
|
|
|
We strapped the mast. cut the mast below 36". nail plated the SER. Extended the bond wire to the water piping. >> Inspection requested via web by Justin Frates Water pipe bond shall terminate in main disconnect
|
Permanent Service | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Daryl DeGrange
|
|
|
Justin Phone #: ###-#### p/s o/h rec ok
|
Issue PAID IN FULL permit | | | 10/2/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/2/2012 | | DONE |
|
|
|
This permit was created on the web by Justin Frates
|