First Notice | 9/13/2013 | 9/13/2013 | 12/4/2013 | | DONE |
Daryl DeGrange
|
|
|
|
Print Statement | | | 12/4/2013 | | DONE |
Christina Prado
|
|
|
|
Final | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins final ok
|
Final | 9/12/2013 | 9/12/2013 | 9/12/2013 | P | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins Kitchen GFCI receptacle not operating,
|
Final | 9/6/2013 | 9/6/2013 | 9/6/2013 | P | PART |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins Partial final ok NEC 408.4 Need to complete panel directory NEC 406.8(B)(1) Weather resistant GFCI for front replaced receptacles, Disconnecting means for front gas fired unit heaters or breaker lockout on branch circuit.
|
Electrical Rough-In | 8/21/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Daryl DeGrange
|
|
|
Need a wall cover inspection in the foyer. If you have any questions please callRyan Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins rough-in ok cover
|
Electrical Rough-In | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | PASS |
Daryl DeGrange
|
|
|
Need rough in inspection for walls and ceiling. Thank you Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins rough-in ok cover
|
Electrical Rough-In | 8/1/2013 | 8/1/2013 | 8/1/2013 | P | NR |
Daryl DeGrange
|
|
|
Need a rough in wall inspection this afternoon. After 2:00 would be terrific. Thank you Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins Not ready
|
Electrical Rough-In | 7/26/2013 | 7/26/2013 | 7/29/2013 | P | PASS |
Daryl DeGrange
|
|
|
Rough in walls for cover Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins rough-in ok cover walls
|
Electrical Rough-In | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins rough-in ok cover front exterior entry wall
|
Electrical Rough-In | 7/17/2013 | 7/18/2013 | 7/18/2013 | A | PASS |
Daryl DeGrange
|
|
|
Need an inspection for conduits in slab. Open floor in bar area has new data, power, and speaker conduits. Thank you Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins rough-in ok
|
Issue PAID IN FULL permit | | | 7/15/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 7/15/2013 | | |
|
|
|
|
Application received | | | 7/15/2013 | | DONE |
|
|
|
This permit was created on the web by Thomas Jenkins
|