Final | 1/20/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Rock A. Hudson
|
|
|
Josh is contact thank you Phone #: ###-#### Inspection requested via web by Chris Chesnut No record of floor heat rough in, listing confirmed. At time of final lights in master closet and light over bath tub ok. Final ok
|
Final | 1/15/2015 | 1/16/2015 | 1/16/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Josh is contact. Thanks Phone #: ###-#### Inspection requested via web by Chris Chesnut 210.8- All garage receptacle outlets 120 volt 15 -20 amp shall have GFCI protection. 210.8- Recetacle outlet in unfinished basement shall have GFCI protection. 210.70(A)(3)- Unfinished basement shall have at least 1 lighting outlet controlled by wall switch installed. 314.16- Island outlet boxes shall have sufficient capacity for conductors and device. 8ci box min of 10 needed. 410.16- Master closet luminaires shall have totally enclosed lamps. * Master bath outlets dead. * Unable to verify GFCI protection for master bath floor heat. BCC- At least 50% of lamp shall be energy effient type.
|
Rough-In Permanent Service | 10/23/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Bob Reichert
|
|
|
Josh is contact Phone #: ###-#### Inspection requested via web by Chris Chesnut ri ok, p/s u/g n ok
|
Rough-In Permanent Service | 10/21/2014 | 10/22/2014 | 10/22/2014 | P | NR |
Bob Reichert
|
|
|
Josh is contact. Thanks Phone #: ###-#### Inspection requested via web by Chris Chesnut called, told to call when done, not done with service, riser expansion joint, stapling, nail plates, empty boxes, central vac, etc0
|
Issue PAID IN FULL permit | | | 10/21/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/21/2014 | | DONE |
|
|
|
This permit was created on the web by Chris Chesnut
|