Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
James Ady
|
|
|
James Phone #: ###-#### corrections made final ok
|
Final | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | FAIL |
James Ady
|
|
|
james Phone #: ###-#### 110.3 Reverse polarity on Recep. to Rt of fireplace. 210.8A7 Recep to right of Mudroom sink needs GFCI. 210.8A6 Kitchen counter receps need GFCI. 314.20 Kitchen Backsplash receps need Sparkrings. 352.30A Service riser needs stapped above slip joint. 356.30 A/C flex needs strapped within 12in of disconnect.422.30 Furnace needs disc. 110.24 36in x 36in platform needs constructed in front of meter.
|
Final | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | NR |
James Ady
|
|
|
James ###-#### Platform for Service not in place. Need to recall when permanent platform is installed.
|
Permanent Service | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | CANC |
James Ady
|
|
|
James Phone #: ###-#### Already had service inspected
|
Rough-In Permanent Service | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
James Ady
|
|
|
James Phone #: ###-#### Homeowner stated he would build platform in front of meter. Corrections made rough in ok p/s u/g n ok
|
Electrical Rough-In | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | FAIL |
James Ady
|
|
|
James Phone #: ###-#### Grn Metal Recep box in NET panel, Add receps in kitchen to comply with Countertop layout rules in 210.52. Move receps next to fixed glass door panels to comply with 6ft wall spacing, Add 3way switches at top an bottom of staircase. Add recep in half wall at top of staircase. remove 14awg for vac head from 12 awg circuit.
|
Change Status to I | | | 6/29/2017 | | DONE |
|
|
|
alex
|
Temporary Service | 2/15/2017 | 2/15/2017 | 2/15/2017 | P | PASS |
James Ady
|
|
|
James Phone #: ###-#### t/s u/g n ok
|
Temporary Service | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | FAIL |
James Ady
|
|
|
James Phone #: ###-#### 590.6 GFCI protection shall be provided for all temp wiring installations. 250.53 G Rod & Pipe Electrodes shall be flush or below grade. All openings shall be closed. Secure grounding conductor.
|
Issue PAID IN FULL permit | | | 1/18/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Telephone call | | | 1/18/2017 | | DONE |
|
|
|
called James-he is doing the work and will pay today online
|
Application received | | | 11/21/2016 | | DONE |
|
|
|
This permit was created on the web by james mair
|