Final | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
James Ady
|
|
|
Approved plans onsite. Phone #: ###-#### Inspection requested via web by Ryan King corrections made final ok
|
Final | 12/21/2017 | 12/22/2017 | 12/22/2017 | A | NR |
James Ady
|
|
|
Requested photos have been sent to ###-####. Kevin King can meet onsite to go over installation, please call to schedule ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Ryan King 310.15B3A Adjustment factors for mare than 3 current carrying conductors in coduit. Met Kevin onsite. Labeling of conduits ok. Varified attic wiring and UL listing of all rooftop equipment. Will correct conduit from main panel to subpanel and call for final.
|
Final | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | FAIL |
James Ady
|
|
|
Approved plans onsite. Please call homeowner before arrival to gain access, Tom @ ###-####. Phone #: ###-#### Inspection requested via web by Ryan King talked to Ryan. Need to verify equipment installed on roof, also verify sub panel load.
|
Issue PAID IN FULL permit | | | 10/31/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/31/2017 | | DONE |
|
|
|
This permit was created on the web by Ryan King
|