Site Final | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | NR |
Tony Young
|
|
|
|
General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 | A | PASS |
Pat Lass
|
|
|
looks good
|
General Inspection | 9/12/2008 | 9/12/2008 | 9/12/2008 | P | PASS |
Pat Lass
|
|
|
ok
|
General Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 | A | FAIL |
Pat Lass
|
|
|
dirt tracking out onto parking lot called RP and he said he get on it right away.
|
Random Inspection | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | PASS |
Pat Lass
|
|
|
looks ok
|
Random Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Pat Lass
|
|
|
looked good
|
Random Inspection | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | PASS |
Mike Jordan
|
|
|
sign posted, bmps in place, trackout ok.
|
Site Preparation | 5/22/2008 | 5/27/2008 | 5/27/2008 | P | PART |
Clint A Smith
|
|
|
Discussed with RP (Terry) that things look good but since they are going to be installing a construction entrance to keep up on tracking on a daily basis onto the parking lot. CAS #460
|
Issue & PRINT permit COM | | | 5/16/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/15/2008 | | 5/15/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 5/8/2008 | | 5/8/2008 | | FAIL |
Steven Webb
|
|
|
No RP included on application and contractor is listed.
|
Application received | | | 4/24/2008 | | |
|
|
|
|