General Inspection ESC | 7/6/2010 | 7/6/2010 | 7/6/2010 | | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | PASS |
Steven Webb
|
|
|
|
General Inspection ESC | 6/21/2010 | 6/21/2010 | 6/21/2010 | | PASS |
Steven Webb
|
|
|
No activity, not ready to final but is close.
|
General Inspection ESC | 6/4/2010 | 6/4/2010 | 6/4/2010 | | PASS |
Clint A Smith
|
|
|
No activity
|
General Inspection ESC | 5/20/2010 | 5/20/2010 | 5/20/2010 | | PASS |
Clint A Smith
|
|
|
no activity
|
General Inspection ESC | 5/5/2010 | 5/5/2010 | 5/5/2010 | | PASS |
Clint A Smith
|
|
|
|
General Inspection ESC | 4/20/2010 | 4/20/2010 | 4/20/2010 | | PASS |
Clint A Smith
|
|
|
No activity.
|
BMP Violation | 3/31/2010 | 4/5/2010 | 4/5/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection ESC | 3/31/2010 | 3/31/2010 | 3/31/2010 | | FAIL |
Clint A Smith
|
|
|
Correction Notice(left a message for owner to contact the city over notice.)
1. Provide an RP with day to day control over Erocion and Sediment control issues that can be contacted. 2. Install an approved BMP for the storm drain inlet protection. 3. Install a sediment barrier BMP at the end of the road in the project at the NOrth West end where the disturbed soil meets with the pavement. 4. Post the ESC sign where it is visable from the street withh all of the proper information. **Failure to comply will result in further enforcement. Will re-inspect on 4/5/10PM.
|
BMP Violation | 3/26/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Clint A Smith
|
|
|
Issue has been corrected.
|
Complaint Inspection | 3/26/2009 | 3/26/2009 | 3/26/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: (Discussed with RP) 1. Determine and place the right manhole plate on the manhole stub out that is lower than grade. 2. Provide the proper internal and external protection to miniumize turbid run-off from entering the system. Will re-inspect on 2/27/09PM.
|
Override - Parcel Holds | | | 3/26/2009 | | |
|
|
|
|
Random Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Dixie Fellows
|
|
|
job site shut down --site is clean
|
Override - Parcel Holds | | | 1/21/2009 | | |
|
|
|
|
BMP Violation | 10/3/2008 | 10/7/2008 | 10/7/2008 | A | DONE |
Clint A Smith
|
|
|
Moved to a Stop work order.
|
INSP - Stop Work Order | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | FAIL |
Clint A Smith
|
|
|
1. Clean up all sediment and debris out onto the street. 2. Protect all storm drains with approved protection. 3. Install an approved construction entrance. No work inside of the project can occur until all issues have been dealt with, an inspection from me (Clint Smith) to pull the stop work order.
|
BMP Violation | 10/2/2008 | 10/3/2008 | 10/3/2008 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: 1. PRotect 2 storm drain at the street where the entrance of the project is at. Will re-inspect on 10/7/08
|
General Inspection | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | FAIL |
Clint A Smith
|
|
|
left a message with the RP. Correction Notice: Clean up all sediment off of project areav into the street. Protect the 2 storm drain inlets with approver protection. Failure to comply will result in a Stop work order. Will re-inspect on 10/3/08
|
Routing - Erosion and Sediment | 8/27/2008 | | 8/28/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditons.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2008 | | |
|
|
|
|
Telephone call | | | 8/28/2008 | | DONE |
|
|
|
t/c w doug mcalvain at ###-#### - permit ready and fees given - also need rp name
|
Permit Ready to Issue | | | 8/28/2008 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 8/28/2008 | | DONE |
|
|
|
|
Application received | | | 8/27/2008 | | |
|
|
|
|