DOC - Permit Finaled | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 3/17/2009 | 3/17/2009 | 3/17/2009 | P | PART |
Clint A Smith
|
|
|
In the process of cleaning up all trash debris within the back corner of the project. Site looks good.
|
Aging Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 | A | PART |
Jim Storey
|
|
|
wip
|
General Inspection | 2/19/2009 | 2/23/2009 | 2/23/2009 | A | PART |
Clint A Smith
|
|
|
Most of the trash debris has been and is in the process of being removed. Told Contractor though it is gone they still need to provide a container type.
|
General Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal Correction to RP via Message: 1. Provide a waste debris container for all trash debris generated on the project area. 2. Clean up all trash debris on the project area. Dispose of in a proper mannor or place into a wate container. Will re-inspect on 2/23/09 AM.
|
Random Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/17/2008 | 12/17/2008 | 12/17/2008 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 12/10/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/26/2008 | | 11/26/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. Must have valid RP prior to start of work. RP will have day-to-day control from start to final stabilization has been completed.
|
Application received | | | 11/17/2008 | | |
|
|
|
|