Site Final | 10/15/2009 | 10/15/2009 | 10/15/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/15/2009 | 10/15/2009 | 10/15/2009 | P | PASS |
Mike Jordan
|
|
|
Final stabalization has been completed.
|
Site Preparation | 10/15/2009 | 10/15/2009 | 10/15/2009 | P | CANC |
Mike Jordan
|
|
|
|
Site Final | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | CANC |
Mike Jordan
|
|
|
|
BMP Violation | 8/26/2009 | 8/27/2009 | 8/27/2009 | A | PASS |
Eric Strole
|
|
|
|
BMP Violation | 8/26/2009 | 8/26/2009 | 8/26/2009 | A | FAIL |
Eric Strole
|
|
|
left verbal & written correction with rp that he needs to washout concrete trucks in washout pit. concrete truck washed out on ground, if not cleaned up by days end a stop work will be issued.
|
Random Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | PART |
Clint A Smith
|
|
|
Contacted developer to provide a washout pit for the two other projects within developement area. All other areas of compliance have been met per Site developer.
|
Random Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 5/29/2009 | 5/29/2009 | 5/29/2009 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. Conc. washout area in place. BMP's in place.
|
Issue & PRINT permit COM | | | 4/16/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/13/2009 | | 3/13/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 3/5/2009 | | |
|
|
|
|