Site Final | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 8/11/2009 | 8/11/2009 | 8/11/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, still not planted to grass
|
Random Inspection | 7/16/2009 | 7/16/2009 | 7/16/2009 | A | PASS |
Eric Strole
|
|
|
|
Random Inspection | 7/7/2009 | 7/7/2009 | 7/7/2009 | A | PASS |
Troy James
|
|
|
|
General Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 5/26/2009 | 5/26/2009 | 5/26/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PASS |
Jim Sly
|
|
|
Brandon
|
Random Inspection | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PASS |
Troy James
|
|
|
|
General Inspection | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 4/29/2009 | 4/30/2009 | 4/30/2009 | A | PASS |
Clint A Smith
|
|
|
Discussed with RP over what he needs to provide on his project(trash container, and a washout pit due to brick work will be occuring). And went over the stadards that they must comply by.
|
Site Preparation | 4/10/2009 | 4/17/2009 | 4/17/2009 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 4/10/2009 | 4/10/2009 | 4/10/2009 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 4/3/2009 | | DONE |
|
|
|
|
Application received | | | 3/10/2009 | | |
|
|
|
|