Site Final | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is now completed.
|
Site Final | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | FAIL |
Mike Jordan
|
|
|
70% reveg. not achieved.
|
General Inspection | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, not done
|
Random Inspection | 8/12/2009 | 8/12/2009 | 8/12/2009 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/7/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Eric Strole
|
|
|
|
BMP Violation | 8/5/2009 | 8/7/2009 | 8/7/2009 | P | FAIL |
Eric Strole
|
|
|
left verbal & written correction with rp to complete previous correction by days end or a stop work will be issued. no corrections from previous correction have been made.
|
Random Inspection | 8/5/2009 | 8/5/2009 | 8/5/2009 | P | FAIL |
Eric Strole
|
|
|
Left verbal correction with rp to clean up all trash, gutter pans, dirt & debris off all hard surfaces & maintain DI boxes by 8-7-09 am. Will reinspect 08-07-09 pm.
|
Random Inspection | 7/20/2009 | 7/20/2009 | 7/20/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 7/17/2009 | 7/17/2009 | 7/17/2009 | P | PART |
Jim Storey
|
|
|
|
Random Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 6/17/2009 | 6/19/2009 | 6/19/2009 | A | PART |
Clint A Smith
|
|
|
made an effort on cleaning out d.i.
|
Site Preparation | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted. BMP's in place. Conc. washout alsom provided. ok.
|
Site Preparation | 6/17/2009 | 6/17/2009 | 6/17/2009 | | NR |
Clint A Smith
|
|
|
Project has not started but there already is a exsisting project occuring. ESC09-00240 Verbal to RP: Maintain storm drain ilet after next set of storms today. Will re-inspect on 6/19/09AM.
|
Issue & PRINT permit SFD | | | 6/10/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 5/20/2009 | | |
|
|
|
|