Site Final | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 9/22/2009 | 9/22/2009 | 9/22/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
Random Inspection | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 7/22/2009 | 7/22/2009 | 7/22/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
Random Inspection | 6/26/2009 | 6/26/2009 | 6/26/2009 | P | PASS |
Jack Frank
|
|
|
ok hard surfaces cleaned up, told them it shall be done aon a daily basis
|
General Inspection | 6/25/2009 | 6/25/2009 | 6/25/2009 | P | PART |
Jack Frank
|
|
|
left verbal clean hard surfaces
|
Random Inspection | 6/18/2009 | 6/19/2009 | 6/19/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PART |
Tom Arcoraci
|
|
|
incomplete
|
Site Preparation | 6/5/2009 | 6/5/2009 | 6/5/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Protect stock pile at front of project area. Provide a concrete washout prior to any concrete being poured.
|
Routing - Erosion and Sediment | 5/29/2009 | | 5/29/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
Issue & PRINT permit SFD | | | 5/29/2009 | | DONE |
|
|
|
|
Application received | | | 5/28/2009 | | |
|
|
|
|