Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberFIR00-00259
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 911 N MOUNTAIN COVE RD
Project NameSPR MOUNTAIN COVE SCH
Customer Number 
ePlanReview 
Description
MOUNTAIN COVE SCHOOL * TO FIRE SPRINKLER AN ADDITION OF A 6,950 SQ. FT. ONE STORY TYPE II-1HR GYMNASIUM WITH LOCKER ROOMS WITH AREA SEPARATION WALL AND 125 SQ. FT. CAREER CENTER UNDER THE EXISTING OVERHANG OF THE EXISTING TYPE VN BUILDING. OTHER WORK TO INCLUDE INTERIOR PARTITIONS TO CREATE A 1,036 SQ. FT. LIBRARY AND ADJOINING HALLWAY AND ALL RELATED UNDERGROUND WORK PER APPROVED PLANS AND ATTACHMENTS. BLD99-0357 *JWA* (FIRE SPRINKLERS ON THE NEW GYM USED FOR SUBSTITUTION OF 1HR AND AREA ON THE EXISTING BUILDING).
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/14/20018/14/20018/14/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 8/14/2001 4:37:19 PM
DOC - Permit Finaled8/14/20018/14/20018/14/2001PPASS
DetailsRick Jackson
Finaled by inspector at 8/14/2001 4:37:56 PM
INSP-Final Inspection12/7/200012/7/200012/7/2000PPASS
DetailsRick Jackson
Added by Inspector: 409 On 12/7/2000 2:45:11 PM
INSP-Sprinkler Rough-in/Hydro10/25/200010/25/200010/25/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/25/2000 at 07:22:48. Contact: ###-####.hydro okay - nned to test FDC; r/i need straps on all hangers, replace heads on anti-freeze loop, sign for FDC indicating gymnasium only, 10/26/2000 12:00:15 PM
INSP-Supply line flush10/23/200010/23/200010/23/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/23/2000 at 08:37:53. Contact: ###-####. underground flush okay 10/24/2000 8:00:15 AM
Inspection Record Card- Bld8/28/20008/28/20008/28/2000 DONE
Telephone call  8/28/2000 DONE
###-#### busy will keep trying
Issue permit  8/28/2000 DONE
Sprinkler Plan Check8/25/2000 8/25/2000 PASS
DetailsBill Alexander
Approved on condition the outside (anti-freeze) heads are changed to K-4.2 QR type heads.
PLANS/APPL TAKEN TO FRONT DESK  8/25/2000 PASS
DetailsBill Alexander
Telephone call  8/25/2000 DONE
Faxed copy of review to Shilo.
Sprinkler Plan Check8/18/2000 8/22/2000 FAIL
DetailsBill Alexander
Wrong BFP used. Need RPDC and not a DC. Needs redesigned for increase pressure loss and 5% minimum cushion.
Telephone call  8/22/2000 DONE
DetailsBill Alexander
Faxed failed copy of plan review to Shilo, 9:40 am.
INSP-Conference8/18/20008/18/20008/18/2000APART
DetailsRick Jackson
Added by Inspector: 409 On 8/18/2000 sprinkler plans not approved - told contractor to get Shilo plans resubmitted for approval. system is installed except for the riser.
Miscellaneous action  8/17/2000 FAIL
DetailsBill Alexander
Plans taken to the front desk for calling and pick up-returned denied plans.
Meeting  8/17/2000 DONE
Meeting with Rick Jackson. He will drive by today and see what if anything is happening on this permit.
Telephone call  8/17/2000 DONE
Called Ray Lopez at ###-#### plans failed and they need to be picked up.
Telephone call  8/2/2000 DONE
Stan Beus called concerning water supply control problems. Indicated plans are still not approved. Said he would get to the bottom of it.
Sprinkler Plan Check4/26/2000 5/9/2000 FAIL
DetailsBill Alexander
Need water supply verification, anti-freeze loop calculations. Minor details needed while resubmitting to clarify information for easier future interpretations.
Telephone call  5/9/2000 DONE
DetailsBill Alexander
Copy of failed review notes faxed to designer.
Application received  4/26/2000 PASS
DetailsBill Alexander
Case Summary    DONE