INSP-Final Inspection | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/14/2001 4:37:19 PM
|
DOC - Permit Finaled | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/14/2001 4:37:56 PM
|
INSP-Final Inspection | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/7/2000 2:45:11 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 07:22:48. Contact: ###-####.hydro okay - nned to test FDC; r/i need straps on all hangers, replace heads on anti-freeze loop, sign for FDC indicating gymnasium only, 10/26/2000 12:00:15 PM
|
INSP-Supply line flush | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 08:37:53. Contact: ###-####. underground flush okay 10/24/2000 8:00:15 AM
|
Inspection Record Card- Bld | 8/28/2000 | 8/28/2000 | 8/28/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2000 | | DONE |
|
|
|
###-#### busy will keep trying
|
Issue permit | | | 8/28/2000 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/25/2000 | | 8/25/2000 | | PASS |
Bill Alexander
|
|
|
Approved on condition the outside (anti-freeze) heads are changed to K-4.2 QR type heads.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 8/25/2000 | | DONE |
|
|
|
Faxed copy of review to Shilo.
|
Sprinkler Plan Check | 8/18/2000 | | 8/22/2000 | | FAIL |
Bill Alexander
|
|
|
Wrong BFP used. Need RPDC and not a DC. Needs redesigned for increase pressure loss and 5% minimum cushion.
|
Telephone call | | | 8/22/2000 | | DONE |
Bill Alexander
|
|
|
Faxed failed copy of plan review to Shilo, 9:40 am.
|
INSP-Conference | 8/18/2000 | 8/18/2000 | 8/18/2000 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/18/2000 sprinkler plans not approved - told contractor to get Shilo plans resubmitted for approval. system is installed except for the riser.
|
Miscellaneous action | | | 8/17/2000 | | FAIL |
Bill Alexander
|
|
|
Plans taken to the front desk for calling and pick up-returned denied plans.
|
Meeting | | | 8/17/2000 | | DONE |
|
|
|
Meeting with Rick Jackson. He will drive by today and see what if anything is happening on this permit.
|
Telephone call | | | 8/17/2000 | | DONE |
|
|
|
Called Ray Lopez at ###-#### plans failed and they need to be picked up.
|
Telephone call | | | 8/2/2000 | | DONE |
|
|
|
Stan Beus called concerning water supply control problems. Indicated plans are still not approved. Said he would get to the bottom of it.
|
Sprinkler Plan Check | 4/26/2000 | | 5/9/2000 | | FAIL |
Bill Alexander
|
|
|
Need water supply verification, anti-freeze loop calculations. Minor details needed while resubmitting to clarify information for easier future interpretations.
|
Telephone call | | | 5/9/2000 | | DONE |
Bill Alexander
|
|
|
Copy of failed review notes faxed to designer.
|
Application received | | | 4/26/2000 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|