DOC - Permit Finaled | | | 7/31/2001 | | PASS |
Joe Tawney
|
|
|
Reference email from Joe Tawney, 7/31/01
|
INSP-Final Inspection | 6/20/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Joe Tawney
|
|
|
OK on spklr in shell 6/21/2001 3:43:13 PM
|
INSP-Sprinkler Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 5/8/2001 2:33:52 PM OK on spklr rough in after moving 2 heads
|
Issue permit | | | 4/11/2001 | | |
|
|
|
|
Plan assigned to (Bill) | 3/26/2001 | | 4/9/2001 | | DONE |
|
|
|
4/9/2001 10:47:31 SLR - activity updated through activity FIRA22 from case FIR01-00141.
|
Alarm Plan Check | | | 4/9/2001 | | PASS |
|
|
|
REsubmittal received 4/6/2001 acceptable.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2001 | | PASS |
|
|
|
|
Telephone call | | | 4/9/2001 | | DONE |
|
|
|
called permit ready
|
Inspection Record Card- Fire | 4/9/2001 | | 4/9/2001 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/6/2001 | | FAIL |
|
|
|
Phoned comments to AS contractor.No write up. Requires calc's to re-verify density since the K-factor of heads and head spacing are modified.
|
Application received | | | 3/26/2001 | | |
|
|
|
|