INSP-Final Inspection | 6/21/2002 | 6/21/2002 | 6/21/2002 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled
|
DOC - Permit Finaled | 6/21/2002 | 6/21/2002 | 6/21/2002 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 6/21/2002 9:42:52 AM
|
INSP-Conference | 4/15/2002 | 4/15/2002 | 4/15/2002 | A | DONE |
Troy Cobbley
|
|
|
I spoke with Phil (###-####) and notified him that the existing elevator recall system will need to be intergrated with the new fire alarm system per NFPA 72 and that plans will need to be submitted for approval. The fire alarm panel as tested is operational
|
INSP-Conference | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | DONE |
Troy Cobbley
|
|
|
I left the maintenance person (Jerry) a voice mail to make him aware of the existing elevator needing to be connected to the new fire alarm panel. I left him my cell phone number to contact me.
|
INSP-Alarm Testing | 4/4/2002 | 4/4/2002 | 4/4/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide corrected zone map at facp panel, provide panel location map for knox box, provide current fire sprinkler riser inspection tag and flow test sprinkler system 1 to verify signal 4/5/2002 10:52:17 AM
|
Issue permit | | | 3/1/2002 | | |
|
|
|
|
Plan assigned to (SAM) | 2/6/2002 | | 2/21/2002 | | DONE |
|
|
|
2/21/2002 14:48:14 SLR - activity updated through activity FIRA22 from case FIR02-00038.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2002 | | |
|
|
|
|
Inspection Record Card- Fire | 2/21/2002 | | 2/21/2002 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2002 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/12/2002 | | PASS |
|
|
|
|
Application received | | | 2/6/2002 | | |
|
|
|
|