INSP-Final Inspection | 4/12/2004 | 4/12/2004 | 4/12/2004 | A | PASS |
Troy Cobbley
|
|
|
Underground supply finaled. Hydro test and flush recorded under FIR03-00780
|
DOC - Permit Finaled | 4/12/2004 | 4/12/2004 | 4/12/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 4/12/2004 10:49:44 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/13/2003 | 11/14/2003 | 11/14/2003 | A | PASS |
Troy Cobbley
|
|
|
Underground supply piping is now ok to cover 11/14/2003 9:20:13 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2003 | 11/13/2003 | 11/13/2003 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for the underground supply piping. Pipe does not meet the minimum 4'-6" bury. Top of pipe is around 4' 11/13/2003 9:32:40 AM
|
Issue and Print Permit | | | 10/31/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/29/2003 | | 10/30/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/29/2003 | | 10/30/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2003 | | DONE |
|
|
|
|
Miscellaneous action | | | 10/30/2003 | | DONE |
|
|
|
Emailed copy of review notes to Ross Farris.
|
Inspection Record Card- Fire | 10/30/2003 | | 10/30/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/30/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2003 | | DONE |
|
|
|
Spoke with Alisha told permit ready & fees
|
Application received | | | 10/29/2003 | | |
|
|
|
|