INSP-Final Inspection | 4/20/2004 | 4/20/2004 | 4/20/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/20/2004 at 7:32:12 AM. Contact: ###-####.
|
DOC - Permit Finaled | 4/20/2004 | 4/20/2004 | 4/20/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 4/20/2004 3:28:00 PM
|
INSP-Sprinkler Rough-in | 4/5/2004 | 4/5/2004 | 4/5/2004 | P | PART |
Rick Jackson
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Darla Downs Okay to cover as all items have been corrected; freezer/cooler heads not installed 4/5/2004 11:30:47 AM
|
INSP-Sprinkler Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 | A | FAIL |
Rick Jackson
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Overspaced in lab cutting area; freezer/cooler need dry pendants; kicthen/deli requires head at bread oven; beam clamps need straps throughout the permited area 4/1/2004 10:15:08 AM
|
Plan assigned to (Bill) | 3/2/2004 | | 3/4/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/2/2004 | | 3/4/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/4/2004 | | 3/4/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2004 | | DONE |
|
|
|
spoke with Brode -- permit is ready.
|
Issue and Print Permit | | | 3/4/2004 | | DONE |
|
|
|
|
Application received | | | 3/2/2004 | | |
|
|
|
|