INSP-Final Inspection | 10/25/2006 | 10/27/2006 | 10/27/2006 | A | PASS |
Forrest France
|
|
|
Updated plans have been provided reflecting actual locations of EOL's as requested, voltage drop and EOL locations field verified, final inspection passed, permit finaled.
|
INSP-Final Inspection | 10/5/2006 | 10/9/2006 | 10/9/2006 | A | CANC |
Forrest France
|
|
|
Cancel per contractor due to access issues.
|
INSP-Final Inspection | 5/15/2006 | 5/16/2006 | 5/16/2006 | A | FAIL |
Forrest France
|
|
|
Spot checked EOL locations do not match plans.
|
Permit Ready to Issue | | | 4/19/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2006 | | DONE |
|
|
|
lft vm with ronnie zahm that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 4/19/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/18/2006 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/12/2006 | | |
|
|
|
|
INSP-Final Inspection | 2/27/2006 | 2/28/2006 | 2/28/2006 | P | FAIL |
Forrest France
|
|
|
Need to provide plan resubmittals for field review of changes as requested by previous inspection.
|
INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanniman's permission until resubmittals and elevator are finished and finaled. Elevator is not to be used until inspected.
|
INSP-Alarm Testing | 11/9/2005 | 11/9/2005 | 11/10/2005 | P | DONE |
Troy Cobbley
|
|
|
Tested duct detectors, 2 EOL VD, Cinemedia, verified amperage on the two amplifiers, reverified db levels in the projection areas (changed because of over amperage of one amplifier). Resubmittals are required.
|
INSP-Alarm Testing | 11/8/2005 | 11/8/2005 | 11/8/2005 | A | CANC |
Forrest France
|
|
|
Air flow test for duct detectors is incorrect, measurements were derived from the supply not the return as required.
|
INSP-Alarm Testing | 11/2/2005 | 11/3/2005 | 11/4/2005 | P | FAIL |
Forrest France
|
|
|
Tested theatres, need to retest two EOL , add speaker in theatre 3, still need to test and verify correct locations for duct detectors, see correction notice for listing of remaining items, final inspection not approved at this time.
|
INSP-Alarm Testing | 11/1/2005 | 11/1/2005 | 11/1/2005 | P | FAIL |
Forrest France
|
|
|
Decible levels are inconsistent with requirements for theatre areas.
|
INSP-Alarm Testing | 10/30/2005 | 10/31/2005 | 10/31/2005 | A | FAIL |
Forrest France
|
|
|
Remove NAC A1:3 and speaker circut A1:3, revise duct detectors, NAC B4 circut is less than 21.6 EOL, verify wall mounted AV's are not blocked by video games when installed, check battery backup quantity allowed at theatres, partial inspection only no theatres inspected at this time.
|
INSP-Alarm Testing | 10/24/2005 | 10/25/2005 | 10/25/2005 | P | FAIL |
Forrest France
|
|
|
The duct detectors are installed on the supply side, not return as code requires.
|
INSP-Alarm Testing | 10/24/2005 | 10/24/2005 | 10/24/2005 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today.
|
INSP-Alarm Testing | 10/20/2005 | 10/21/2005 | 10/21/2005 | A | NR |
Forrest France
|
|
|
The core and shell permit must be finaled prior to TI approval.
|
INSP-Alarm Testing | 10/18/2005 | 10/20/2005 | 10/20/2005 | A | NR |
Forrest France
|
|
|
Work is not complete per discussion with contractor, inspection to be rescheduled.
|
INSP-Final Inspection | 10/13/2005 | 10/14/2005 | 10/14/2005 | A | CANC |
Forrest France
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie brian anderson cancl
|
Permit Ready to Issue | | | 8/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/25/2005 | | 8/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2005 | | DONE |
|
|
|
Spoke with Ronnie and told him that permit is ready & fees///8/25/05 9:22am BAS
|
Issue and Print Permit | | | 8/25/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/24/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 7/29/2005 | | 8/24/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/23/2005 | | DONE |
|
|
|
Received a revised matrix via e-mail
|
Telephone call | | | 8/23/2005 | | DONE |
|
|
|
Called Peter to get clarification regarding the projection areas, are there walls, or are there rails?
He stated rails.
|
Miscellaneous action | | | 8/22/2005 | | DONE |
|
|
|
Request received for approval to install FA components on mezzanine level prior to FA plan approval/permit issuance so as to avoid late construction penalties. Written request and agreement for DevCon to accept full financial responsibility for all corrections required by final approved plans was typed by JG and issued to Alex Monge, Proj. Mgr., DevCon Construction.
|
Telephone call | | | 8/22/2005 | | DONE |
|
|
|
Left a message for Peter Petroni, needed a revised matrix to include the motorized damper at the top of the elevator and required clarification of projection rooms.
|
Plan resubmittals received | | | 8/15/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 8/12/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Ronnie Zahm at Simplex-Grinnell.
|
Miscellaneous action | | | 8/10/2005 | | DONE |
|
|
|
E-mail received from Ronnie Zahm to request permission from Sam Rogers to start pulling wire. Approved. See Attached e-mail.
|
Application received | | | 7/29/2005 | | |
|
|
|
|
Case Summary | | | 7/29/2005 | | |
|
|
|
|