INSP-Final Inspection | 4/11/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Forrest France
|
|
|
The required corrections have been verified for completion, fire alarm permit finaled.
|
INSP-Final Inspection | 2/10/2006 | 2/14/2006 | 2/14/2006 | A | FAIL |
Forrest France
|
|
|
Provide access doors at two locations as indicated on approved plans for in-duct smoke detectors, provide signage at the door to the FACP room, replace non-functional batteries in the FACP.
|
Issue permit | | | 9/12/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 8/30/2005 | | 9/8/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/8/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/8/2005 | | 9/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2005 | | |
|
|
|
|
Telephone call | | | 9/8/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Case Summary | | | 8/30/2005 | | DONE |
|
|
|
|
Application received | | | 8/30/2005 | | |
|
|
|
|