Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberFIR05-00774
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 1601
Project NameSPR WESTERN PACIFIC TMBR
Customer Number 
ePlanReview 
Description
(WESTERN PACIFIC TIMBER-STE 1601-RESTROOM UPGRADE-LOBBY REMODEL-AND REMAINING 16TH FLOOR SPRINKLER HEAD UPGRADE-US BANK BLDG) This building is fire sprinklered because it is a high-rise. To replace all 135 existing pendant fire sprinklers throughout this permit and the entire remaining floor from standard response to quick response. Also to relocate some existing drops and add 2 quick response SSU's; all for the creation of a 2,624-ft/2 office tenant located on the 16th story of a high rise building (of 19 total stories). Fire sprinkler work is related to the upgrade the 16th story core restrooms, remodel of the 16th story elevator lobby, interior nonbearing walls and suspended ceilings. The floor area of the entire 16th story is about 14,600-ft/2. The "core" has a floor area of about 2,670-ft/2. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. Demolition work permit performed under FIR05-00697 which has had no inspections and is incomplete to date. This permit is attached to BLD05-02270.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/30/200512/30/200512/30/2005PPASS
DetailsForrest France
Defficient items have been corrected, fire sprinkler permit finaled.
INSP-Final Inspection12/15/200512/16/200512/16/2005AFAIL
DetailsForrest France
No final until all ceiling tile and escutcheons are installed, rough-in defficiencies include one office supplying three heads off a 1" line, three areas in which heads are too close to heat diffusers for temp. rating installed, possible obstruction in the womens restroom at stall divider, one office in the existing area is currently being used for storage, heads at this location are spaced for light hazard.
Telephone call  12/13/2005 DONE
gave customer plans no fee due & not change on scope of work
Miscellaneous action  12/12/2005 DONE
Plans taken to the front desk for distribution
Telephone call  12/12/2005 DONE
left mess that permit is ready
Sprinkler Plan Check11/15/2005 12/9/2005 PASS
DetailsTroy Cobbley
Plans approved with comments and annotations
Plan resubmittals received  11/15/2005  
INSP-Sprinkler Rough-in11/14/200511/14/200511/14/2005PPART
DetailsForrest France
Rough-in is acceptable to cover pending approval of field changes on resubmittals, some heads at the north lobby remain to be cut in, heads in the existing areas remain to be changed to quick response.
Issue and Print Permit  11/14/2005 DONE
Sprinkler Plan Check10/20/2005 11/9/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  11/9/2005 DONE
Inspection Record Card- Fire11/9/2005 11/9/2005 DONE
Permit Ready to Issue  11/9/2005 DONE
Telephone call  11/9/2005 DONE
Called & left msg. for Tom that permit was ready to pick up on 11-9-05 @ 2:08 by BAS
Plan assigned to (Bill)10/20/2005 11/9/2005 DONE
DetailsBill Alexander
Application received  10/20/2005