INSP-Final Inspection | 6/28/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Forrest France
|
|
|
Fire alarm work passed field inspection, permit finaled.
|
Issue and Print Permit | | | 6/28/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2006 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 4/4/2006 | | 5/30/2006 | | DONE |
Mary Froemke
|
|
|
This permit was created on the web by Paul Marcolina
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2006 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/30/2006 | | DONE |
|
|
|
NOTE TO INSPECTOR: Horn Panel 1 calculations were incorrect. Revised battery calculations shall be provided to you at inspection.
|
Alarm Plan Check | | | 5/26/2006 | | PASS |
|
|
|
Horn Panel 1 battery calculations show incorrect quantity of appliances.
Provide revised Horn Panel 1 battery calculations to the PDS Fire Inspector at time of inspection.
Approved pending PDS Fire Inspector field verification. No comments written.
|
Application received | | | 4/4/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|