INSP-Final Inspection | 6/27/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2006 | 6/29/2006 | 6/29/2006 | A | PASS |
Forrest France
|
|
|
The remainder of OH rough-in passed inspection.
|
Plan resubmittals received | | | 6/26/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/23/2006 | | 6/23/2006 | | PASS |
Bill Alexander
|
|
|
Plan/installation modifications.
|
INSP-Sprinkler Rough-in/Hydro | 6/15/2006 | 6/16/2006 | 6/16/2006 | A | PART |
Forrest France
|
|
|
Heads at the drop ceiling areas as marked on approved plans are okay to cover, armovers at two locations have overspaced hangers, area to the south and one room at the west not completed for inspection at this time.
|
INSP-Sprinkler Rough-in/Hydro | 6/13/2006 | 6/15/2006 | 6/15/2006 | A | CANC |
Forrest France
|
|
|
partial; Phone #: ###-#### Internet Inspection Request from: Rob Puckett Inspection cancelled from web by: Rob Puckett
|
INSP-Sprinkler Rough-in/Hydro | 5/23/2006 | 5/25/2006 | 5/25/2006 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Contractor wanted to cancel
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/24/2006 | 5/23/2006 | A | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rob Puckett Inspection cancelled from web by: Rob Puckett
|
Plan assigned to (Bill) | 4/19/2006 | | 4/27/2006 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Sprinkler Plan Check | 4/19/2006 | | 4/27/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/27/2006 | | DONE |
|
|
|
|
Application received | | | 4/19/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|