Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberFIR06-00401
StatusFinaled
Name ESI
Site Address 3673 S T K AVE
Project NameSPR SFP II-BLDG 2 VANILLA FIN.
Customer Number 
ePlanReview 
Description
VANILLA FINISH-NO TENANT - SFP II-BLDG 2 * To construct install 3 E.C. Area Density Uprights and 4 SSP's in a new 4,895-ft/2 vanilla finish space for future warehouse with 2 offices and 1 accessible restroom. No occupancy allowed under this permit. Fire sprinkler work is related to the construction of interior partitions to create office area and restroom, installation of a suspended ceiling with lighting and HVAC in office area. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA 13 as regulated by the fire department. Any storage racking over eight feet high will require a separate permit. The shell of this building was constructed under BLD04-00467. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD6-00893.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/7/20066/7/20066/7/2006APASS
DetailsForrest France
Overhead fire sprinkler work passed final field inspection.
INSP-Final Inspection6/5/20066/6/20066/6/2006PNR
DetailsForrest France
Project was unfinished and work still in progress at the time of field inspection approx. 1:30 pm. Notified Mike with Shilo to reschedule when work is completed.
Issue and Print Permit  6/1/2006 DONE
Plan assigned to (Bill)5/30/2006 5/31/2006 DONE
Sprinkler Plan Check5/30/2006 5/31/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  5/31/2006 DONE
Inspection Record Card- Fire5/31/2006 5/31/2006 DONE
Permit Ready to Issue  5/31/2006 DONE
Telephone call  5/31/2006 DONE
tlk to trent bice ###-#### that permit and fees are ready to be picked up
Application received  5/30/2006