INSP-Final Inspection | 9/19/2006 | 9/20/2006 | 9/20/2006 | A | PASS |
Forrest France
|
|
|
Field verified spare heads have been provided in the head boxes, per contractor the required annual inspections were completed on on 9/13/06.
|
INSP-Final Inspection | 8/29/2006 | 8/30/2006 | 8/30/2006 | A | CANC |
Forrest France
|
|
|
Contact: Chris Felty; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Final Inspection | 8/28/2006 | 8/29/2006 | 8/29/2006 | P | FAIL |
Forrest France
|
|
|
Buildings C and D are missing spare heads in the head boxes at the riser, also all four building systems are overdue the required annual inspection to be performed by a licensed fire sprinkler contractor.
|
Issue and Print Permit | | | 6/22/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/7/2006 | | 6/21/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/7/2006 | | 6/21/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/21/2006 | | 6/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2006 | | DONE |
|
|
|
spoke to randy at debest fire@###-####/told permit was ready and fee associated with it
|
Application received | | | 6/7/2006 | | |
|
|
|
|