Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberFIR06-00444
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 465 W GOWEN RD
Project NameSPR UG BOISE SCHOOLS TRANS
Customer Number 
ePlanReview 
Description
BOISE SCHOOL DISTRICT TRANSPORTATION CENTER - To install approximately 200'-0" of 6" C-900 PVC underground, with a 6" D.I. Riser through the floor with a locking gland adapter for fire service supply in a 17,213-ft/2, II-B building. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD06-00444.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/19/200612/19/200612/19/2006PPASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Supply line flush9/20/20069/21/20069/21/2006APART
DetailsForrest France
UG fire supply line flush performed satisfactory.
INSP-Sprinkler Rough-in/Hydro9/19/20069/19/20069/20/2006PPART
DetailsForrest France
UG supply line hydro test completed satisfactory.
CHANGE STATUS TO (ISS)  9/6/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/5/2006 DONE
Copy of re-submitted calculations reflecting change in type of pipe from Sched. 10 to schedule 40. No fee required.
Permit Ready to Issue  9/5/2006 DONE
Telephone call  9/5/2006 DONE
spoke to jeff@###-####/told permit was ready, permit#, name, and no fee
Plan resubmittals received  8/23/2006 DONE
Received revised calc's for a change in type of pipe from schedule 10 used in origianl calc's to schedule 40 which is to be installed. No other plan changes. New calc's show safety margin increased from 23% to 24%. Copy of resubmital modifications re-issued to be kept with approved plan set on site.
INSP-Sprinkler Rough-in6/30/20066/30/20066/30/2006PPART
DetailsForrest France
UG supply line and riser stub are good for cover, need to provide method for seismic clearance at the ductile riser where pipe will pass through floor slab.
INSP-Sprinkler Rough-in6/29/20066/30/20066/30/2006ACANC
DetailsForrest France
Please call 1 hour prior to inspection. UG to cover.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
Inspection Record Card- Fire6/27/2006 6/27/2006 DONE
Permit Ready to Issue  6/27/2006 DONE
Telephone call  6/27/2006 DONE
tlk to rent bice ###-#### that permit and fees are ready to be picked up
Issue and Print Permit  6/27/2006  
Sprinkler Plan Check6/13/2006 6/26/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  6/26/2006 DONE
DetailsBill Alexander
Application received  6/13/2006  
Case Summary  6/13/2006 DONE
Plan assigned to (Bill)6/13/2006