INSP-Final Inspection | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line flush performed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2006 | 9/19/2006 | 9/20/2006 | P | PART |
Forrest France
|
|
|
UG supply line hydro test completed satisfactory.
|
CHANGE STATUS TO (ISS) | | | 9/6/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2006 | | DONE |
|
|
|
Copy of re-submitted calculations reflecting change in type of pipe from Sched. 10 to schedule 40. No fee required.
|
Permit Ready to Issue | | | 9/5/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2006 | | DONE |
|
|
|
spoke to jeff@###-####/told permit was ready, permit#, name, and no fee
|
Plan resubmittals received | | | 8/23/2006 | | DONE |
|
|
|
Received revised calc's for a change in type of pipe from schedule 10 used in origianl calc's to schedule 40 which is to be installed. No other plan changes. New calc's show safety margin increased from 23% to 24%. Copy of resubmital modifications re-issued to be kept with approved plan set on site.
|
INSP-Sprinkler Rough-in | 6/30/2006 | 6/30/2006 | 6/30/2006 | P | PART |
Forrest France
|
|
|
UG supply line and riser stub are good for cover, need to provide method for seismic clearance at the ductile riser where pipe will pass through floor slab.
|
INSP-Sprinkler Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | CANC |
Forrest France
|
|
|
Please call 1 hour prior to inspection. UG to cover.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
Inspection Record Card- Fire | 6/27/2006 | | 6/27/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2006 | | DONE |
|
|
|
tlk to rent bice ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 6/27/2006 | | |
|
|
|
|
Sprinkler Plan Check | 6/13/2006 | | 6/26/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2006 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 6/13/2006 | | |
|
|
|
|
Case Summary | | | 6/13/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/13/2006 | | | | |
|
|
|
|