INSP-Final Inspection | 8/23/2006 | 8/23/2006 | 8/24/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2006 | 8/23/2006 | 8/23/2006 | P | PART |
Forrest France
|
|
|
OH rough-in is acceptable, hydrostatic test for the new piping at the east elevator machine room passed.
|
Telephone call | | | 8/22/2006 | | DONE |
|
|
|
spoke to brad@###-####/told permit was ready, permit#, project name & address, and fee
|
Issue and Print Permit | | | 8/22/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/21/2006 | | 8/21/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 8/18/2006 | | PASS |
|
|
|
Reviewed by B. Johnson.
|
Miscellaneous action | | | 8/11/2006 | | DONE |
|
|
|
Early Start request approved; to remove 3 heads, install two.
|
Application received | | | 7/25/2006 | | |
|
|
|
|
Plan assigned to (Bill) | 7/25/2006 | | | | |
|
|
|
|