INSP-Final Inspection | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Forrest France
|
|
|
OH rough-in is okay to cover at the drop ceiling areas, one arm-over has an overspaced hanger which is to be relocated and verified for code compliance prior to final.
|
INSP-Sprinkler Rough-in | 8/30/2006 | 8/31/2006 | 8/31/2006 | A | PART |
Forrest France
|
|
|
OH rough-in is good for cover at the west portion of phase 2 remodel as marked on approved plans.
|
Plan assigned to (Scott) | 8/10/2006 | | 8/14/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/14/2006 | | 8/14/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/14/2006 | | 8/14/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/14/2006 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 8/14/2006 | | DONE |
|
|
|
|
Application received | | | 8/10/2006 | | |
|
|
|
|